How to Change the Language in GanttFather

Switch the GanttFather interface among 11 languages from your photo at the top right, under Preferences. Project content stays as you wrote it.

GanttFather
Updated November 1, 2026 4 min read
View as Markdown
The short answer

Switch the GanttFather interface among 11 languages from your photo at the top right, under Preferences. Project content stays as you wrote it.

How do you change the language in GanttFather?

Click your photo at the top right, open Preferences, and pick a language under Language. The interface switches at once. Project content is not translated.

Which languages are available?

GanttFather offers 11 interface languages, each written in its own language:

  • English (US)
  • 中文 (中国)
  • Français (France)
  • Deutsch (Deutschland)
  • हिन्दी (भारत)
  • Indonesia (Indonesia)
  • Italiano (Italia)
  • 日本語 (日本)
  • 한국어 (대한민국)
  • Português (Brasil)
  • Español (Latinoamérica)

Steps

  1. Click your photo at the top right.
  2. Click Preferences. It says how you see and use the app.
  3. Under Language, open the language picker and choose a language. A check mark shows the current one.

The same Preferences page has the Theme options: System, White, Bone, Sage and Dark. System follows your device: White by day, Dark at night. If you used the Focus theme or the old Dark theme, you now have the single Dark theme. Nobody’s theme changes unless they choose it.

What changes and what does not

The menus, buttons, dialogs and messages change language. The names of your projects and tasks stay exactly as you or your team typed them. The sign-in screen also has a language picker in its top bar, so you can switch before you sign in.

Common problems

SymptomCauseFix
My task names did not changeProject content is not translated.Rename tasks yourself; this is by design.
The language is not the one I expectedThe picker was set to another language.Open Preferences from your photo and choose again.

Can your team use GanttFather in its own language?

Yes. The app is available in 11 languages, and each person chooses their own, so one project can be read in several languages at once. Project content stays in the language it was written in.

Open GanttFather and set your language from Preferences, behind your photo at the top right.

Frequently asked questions

Does changing my language change my teammates’ language?

No. The interface language is a preference for your own view.

Are task names translated?

No. The interface is translated; project content is not.

Where do I find the language setting?

Behind your photo at the top right, under Preferences, then Language.

Want to skip the reading?

GanttFather is free forever, with no card and no trial.

Start free

Next up