---
title: "How to Change the Language in GanttFather | GanttFather Blog"
description: "Switch the GanttFather interface among 11 languages from your photo at the top right, under Preferences. Project content stays as you wrote it."
canonical: "https://ganttfather.com/article/how-to-change-language-in-ganttfather/"
locale: "en"
category: "product"
---

# How to Change the Language in GanttFather | GanttFather Blog

# How to Change the Language in GanttFather

 Switch the GanttFather interface among 11 languages from your photo at the top right, under Preferences. Project content stays as you wrote it.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 1, 2026 4 min read

 The short answer

 Switch the GanttFather interface among 11 languages from your photo at the top right, under Preferences. Project content stays as you wrote it.

## How do you change the language in GanttFather?

 **Click your photo at the top right, open Preferences, and pick a language under Language.** The interface switches at once. Project content is not translated.

## Which languages are available?

 GanttFather offers 11 interface languages, each written in its own language:

- English (US)

- 中文 (中国)

- Français (France)

- Deutsch (Deutschland)

- हिन्दी (भारत)

- Indonesia (Indonesia)

- Italiano (Italia)

- 日本語 (日本)

- 한국어 (대한민국)

- Português (Brasil)

- Español (Latinoamérica)

## Steps

- Click your photo at the top right.

- Click **Preferences**. It says how you see and use the app.

- Under **Language**, open the language picker and choose a language. A check mark shows the current one.

 The same Preferences page has the **Theme** options: System, White, Bone, Sage and Dark. **System** follows your device: White by day, Dark at night. If you used the Focus theme or the old Dark theme, you now have the single Dark theme. Nobody’s theme changes unless they choose it.

## What changes and what does not

 The menus, buttons, dialogs and messages change language. The names of your projects and tasks stay exactly as you or your team typed them. The sign-in screen also has a language picker in its top bar, so you can switch before you sign in.

## Common problems

 Symptom Cause Fix

 My task names did not change Project content is not translated. Rename tasks yourself; this is by design.

 The language is not the one I expected The picker was set to another language. Open **Preferences** from your photo and choose again.

## Related guides

- [How to sign in to GanttFather or create an account](https://ganttfather.com/article/how-to-sign-in-to-ganttfather/)

- [How to change your GanttFather notification settings](https://ganttfather.com/article/how-to-change-ganttfather-notification-settings/)

## Can your team use GanttFather in its own language?

 Yes. The app is available in 11 languages, and each person chooses their own, so one project can be read in several languages at once. Project content stays in the language it was written in.

 [Open GanttFather](https://ganttfather.com/) and set your language from Preferences, behind your photo at the top right.

## Frequently asked questions

### Does changing my language change my teammates’ language?

 No. The interface language is a preference for your own view.

### Are task names translated?

 No. The interface is translated; project content is not.

### Where do I find the language setting?

 Behind your photo at the top right, under **Preferences**, then **Language**.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 language settings preferences how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)
