v0.25.1

A steadier Azure DevOps experience

One guided Configure fields flow. Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in. Steadier sync progress. While Azure DevOps work is importing, GanttFather checks progress without repeatedly refreshing the connection or…

GanttFather release v0.25.1
The GanttFather workspace after this release, with dependencies and the critical path visible.

Improved

  • One guided Configure fields flow. Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in.
  • Steadier sync progress. While Azure DevOps work is importing, GanttFather checks progress without repeatedly refreshing the connection or sending extra requests.
  • A smoother recovery after reconnecting. When you update Azure DevOps access, source details refresh so you can continue setup without starting over.
  • A calmer integrations screen. Parent authority controls stay aligned, explain when only the project owner can change them, and source-menu actions use the full clickable row.

Bug Fixes

  • Interrupted syncs no longer stay stuck. If an import is interrupted by a restart or connection problem, it is safely made ready to retry.
  • Closing or retrying setup is safe. You can close a pending setup or try again without leaving the page spinning; brief connection hiccups get a chance to recover.