v0.25.1
A steadier Azure DevOps experience
One guided Configure fields flow. Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in. Steadier sync progress. While Azure DevOps work is importing, GanttFather checks progress without repeatedly refreshing the connection or…
Improved
- One guided Configure fields flow. Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in.
- Steadier sync progress. While Azure DevOps work is importing, GanttFather checks progress without repeatedly refreshing the connection or sending extra requests.
- A smoother recovery after reconnecting. When you update Azure DevOps access, source details refresh so you can continue setup without starting over.
- A calmer integrations screen. Parent authority controls stay aligned, explain when only the project owner can change them, and source-menu actions use the full clickable row.
Bug Fixes
- Interrupted syncs no longer stay stuck. If an import is interrupted by a restart or connection problem, it is safely made ready to retry.
- Closing or retrying setup is safe. You can close a pending setup or try again without leaving the page spinning; brief connection hiccups get a chance to recover.