Excel alternative · checked 7 November 2026

When is an Excel Gantt chart enough, and what do you use when it is not?

Excel is enough for a short schedule that one person keeps and few tasks depend on. It stops being enough when a date moves and the tasks after it should move too, or when several people edit. Then a planning tool is better. GanttFather is free for one project, and you can bring your task rows over through an .xlsx sheet.

Why an Excel Gantt chart gets tiring

An Excel Gantt chart is a drawing of dates. The bars follow the Start and Duration cells, and nothing else. Change one date and the bar moves. The five tasks that wait on it do not.

That is fine for a week. It wears you down when:

  • one slipped task means editing a dozen cells, in order, by hand;
  • two people open the file and one overwrites the other;
  • someone asks for the current version and there are three;
  • you want the critical path and end up building the scheduling logic yourself.

Excel or a planning tool: how to decide

Your situation Excel is enough A planning tool is better
SizeA short list of tasksA long list, or tasks in groups under parents
Who editsOne personSeveral people, at the same time
DependenciesFew, mostly one after anotherMany, with parallel work, lags or days off
When a date movesYou adjust the rows by handThe tasks that depend on it move for you
OutputA static slide or a printed pageA live plan others open to read the current dates
Critical pathNot neededYou need to see what sets the finish date

Our guide to making a Gantt chart in Excel builds one step by step and shows where the manual work starts. It cites Microsoft's own page on Gantt charts in Excel.

Where Excel is still the better tool

  • Most people can open the file. Microsoft offers Excel for the web free of charge.
  • It has formulas, so costs, hours and anything else can sit next to the dates.
  • Workbooks kept in OneDrive or SharePoint Online can be co-authored, and Microsoft says changes show up in seconds.
  • For a one-off chart for a slide, it is the fastest route.
  • One tool fewer for the company to manage.

What to use when Excel is not enough

Tasks that depend on each other, free: GanttFather

GanttFather is free project management software. One project you own is free, with 2 editors and unlimited viewers, and no feature is held back. When a task moves, the tasks that depend on it move with it, across four link types with lag in days, and working calendars and days off are respected. A Critical Path button in the toolbar marks the chain that sets your finish date. Changes from others appear without a reload, and a view-only link opens the plan with no account.

What you give up: formulas, offline use, baselines, costs and timesheets. Each extra project is US$5 a month and each extra editor US$2 a month.

Same file, easier sharing: Google Sheets

Sheets keeps the spreadsheet model and lets several people edit in the browser. It is still a grid, so dependencies are still your formulas. See GanttFather vs Google Sheets for a feature-by-feature table.

Already on Microsoft 365: Planner or Project

If your company pays for Microsoft 365, ask IT which Planner or Project licence you already have before you add a tool. The page on a free Microsoft Project alternative covers the options. Check current prices on Microsoft's pages, as they change by plan and licence.

A free desktop tool: GanttProject

GanttProject is a free desktop app with every feature included and no limit on projects, tasks or users. It imports MPX, MPP and XML files and exports XML. On 18 October 2026 its latest stable version was 3.3, released on 15 January 2024. Read on ganttproject.biz, 18 October 2026. It is a desktop app that you install and run on your computer.

How to move an Excel plan into GanttFather

  1. Save the workbook as .xlsx. A .xls or .csv file is not read.
  2. Put the tasks on a sheet named exactly Project_Plan. A sheet with any other name is refused with "Missing Project_Plan sheet".
  3. Give the sheet a header row GanttFather can read: Task Name, Start Date, End Date, Owner, Progress and Status. A Lvl or # column sets the subtask level. Columns are found by the words in the headers.
  4. In GanttFather, open Import / export, choose Import Excel and GanttFather format, and upload the file.
  5. Read the review screen, which lists what is new, updated or unchanged and any issues. Nothing is written until you confirm.
  6. Link the tasks in the Gantt. Dependencies, priority, descriptions, effort and colours are not imported, and the drawn bars of your old chart are not either.

No spreadsheet imports exactly as it is. Expect to rename a sheet and a few headers. To see the layout the import expects, export any GanttFather project to Excel first. The Excel import and export guide lists every column. Other tools are on the alternatives page.

Facts on this page checked on .

Frequently asked questions

Does Excel have a Gantt chart?

Not as a chart type. You build one from a stacked bar chart, with the first series hidden, or from cells coloured by a formula. Microsoft supplies templates; the ones we read build the bars from the task cells, highlight dependent tasks with conditional formatting, and leave arrows to be added by hand.

Can an Excel Gantt chart update itself when a date changes?

The bars follow their Start and Duration cells. The dates of the tasks that depend on that task only change if you write formulas for it. Once there are several predecessors, lags or non-working days, those formulas get hard to keep right.

How many tasks is too many for an Excel Gantt chart?

No task count makes Excel wrong by itself. The strain shows in how the file is used: one person keeping it, few dependencies and short lists work well. Several editors, many dependencies or a plan that keeps growing are the signs that a planning tool saves more time than it costs.

Can I import my Excel Gantt chart into GanttFather as it is?

Not as it is. The file must be .xlsx, the sheet must be named Project_Plan, and it needs a header row GanttFather can read. A sheet with another name is refused with "Missing Project_Plan sheet". A .xls or .csv file is not read, and dependencies are not imported.

What headers does the GanttFather import look for?

Task Name, Start Date, End Date, Owner, Progress and Status. A Lvl or # column sets the subtask level. Export a project from GanttFather once to see the exact layout, and match your sheet to it.

Is Google Sheets a better choice than Excel for a shared plan?

It helps with sharing, because everyone edits the same file in the browser. Google's help for its timeline view does not describe dependencies or a critical path. The GanttFather vs Google Sheets page compares the two on what a schedule needs.

Still have questions?

Drop us a line — we usually reply in under a business day.

support@ganttfather.com

Try GanttFather free

One project you own is free, with 2 editors and unlimited free viewers. Each extra project is US$5 a month.

Start free