← Voltar para Novidades
v0.14.0

The task panel, redesigned

New

  • Adaptive compact panel. Narrow the panel and Status becomes a glanceable shape (○ open, ◐ in progress, ✓ done) and Assigned a single avatar — task names keep the room.
  • Double-click the divider to fit your longest task name; double-click again to reset.

Improved

  • Freer panel resize. Drag from slim to nearly full screen; width and collapsed state are remembered per project.
  • Names first. Fixed column widths — every extra pixel goes to the task name. Hover to read long ones.
  • Lighter toolbar. Create task now sits beside Excel with a clear label; Critical Path and History are compact icons; Expand/Collapse merged into one toggle.
  • Gantt and List match. Same columns, labels and icons in both views.
  • Readable history. Task and person names instead of identifiers; filter automatic vs manual versions.
  • Connection status, up top. Realtime state shows beside your team’s avatars instead of a corner popup.

Bug Fixes

  • Timeline stays behind the panel — no more Today line or labels bleeding over the task list.
  • No squashed columns at minimum panel width.
  • One clean divider line — highlights only when you grab it.
  • Version history opens for members (view-only).

Teste o GanttFather grátis

Todas as funcionalidades incluídas — Gantt, Kanban, dependências, caminho crítico, sync em tempo real, Excel, agentes IA. O plano grátis inclui 1 projeto seu, 2 assentos de editor e visualizadores e convidados ilimitados.

Começar grátis