Changelog

Novidades

Novas funcionalidades e correções no GanttFather. Atualizado em 26 de outubro de 2026.

outubro de 2026

8 releases
v0.33.0

Choose what reaches you, and safer public links

Settings → Notifications now lets you choose what shows in GanttFather, group by group: things that need you, tasks assigned to you, your projects, reports and Azure DevOps. Things that need you always show.…

Ler mais →
v0.32.1

A notification center that tells you what matters

The bell now shows what happens while you are elsewhere: tasks assigned to you, requests to edit your project, people who join or wait for a seat, and invitations that could not be sent. It also tells you wh…

Ler mais →
v0.31.1

Repeat a task on a schedule, and duplicate tasks

Create a recurring task from the arrow next to New task. Choose how often it repeats, such as every Wednesday or the last working day of each month, and when it ends. Each repeat is a task of its own, so you…

Ler mais →
v0.29.10

Paying for an editor seat sends your invitation

After you pay for an editor seat to invite someone, you come back to your project and the invitation is sent. When you return to an invitation you already paid for, the message says your payment went through…

Ler mais →
v0.29.9

Easier to connect your assistant, and groups open in view-only projects

Connecting the Gemini app is easier. The MCP guide now has the steps for each assistant and editor: Claude, ChatGPT, Gemini, Cursor, VS Code, Copilot, Codex and more. When an assistant asks to connect to you…

Ler mais →
v0.29.8

Quicker Azure DevOps sync and easier invitations

Checking and sending changes to Azure DevOps takes much less time, for a few items as well as for large selections. A sync that cannot finish no longer stays open. It ends by itself. The link in an invitatio…

Ler mais →
v0.29.4

Faster Azure DevOps sync

Sending changes to Azure DevOps is faster, especially on large projects. Sending changes to Azure DevOps no longer stops with “The comparison changed” when nothing has changed.

Ler mais →

setembro de 2026

6 releases
v0.29.3

Smoother Gantt navigation and predictable task scheduling

When a dependency prevents a task move, a message now explains the adjustment and shows the resulting start date. Moving or creating a task no longer unexpectedly pulls the timeline back to today. Collapsing…

Ler mais →
v0.29.0

Bigger task view, easier drag and drop, and Undo

Open a task in a bigger view with room for its description, dependencies, and attachments. You can also expand it to full screen. Drag a task up or down to reorder it. Drag it right to make it a subtask, or…

Ler mais →
v0.28.4

Easier sign-in and consistent task views

A “Last used” label helps you remember your last successful sign-in method on this browser. Gantt, List, and Board now share the same toolbar actions and styling. Landing-page buttons show “Open App” when yo…

Ler mais →
v0.28.3

New themes and smoother collaboration

Deep Focus and Sage bring two new, calmer themes to your workspace. Consistent themes and a cleaner Gantt toolbar, with labeled actions, quick time scales, and simpler task panels. Smoother live cursors, sha…

Ler mais →
v0.28.2

Smoother collaboration and clearer planning

Live cursors keep their last visible position while teammates move between the task panel, timeline, scrolling, zoom levels, and different screen sizes, then move smoothly toward the latest location. Profile…

Ler mais →
v0.28.0

Live cursors and clearer invitations

See where your teammates are working. Follow collaborator cursors across Gantt, List, Board, and shared project controls, with names and profile photos or avatar fallbacks. Keep collaborators in view. Direct…

Ler mais →

agosto de 2026

10 releases
v0.27.0

Clearer Azure DevOps reviews

Review Azure changes before they move. Pull shows what changed and keeps conflicting GanttFather dates and statuses by default, while Restore from Azure remains an explicit choice. Choose when GanttFather sh…

Ler mais →
v0.26.1

A smoother workspace

Smoother team invitations. Returning to a project after inviting a teammate now feels more seamless. Steadier live updates. Your project stays in sync more smoothly after a brief connection change. More reli…

Ler mais →
v0.26.0

A clearer Azure DevOps sync

Azure sync at a glance. A dedicated Gantt shortcut shows your last sync, changes ready to send, and new Azure items ready to bring in. A clearer Azure setup. Helpful explanations now show what each source, t…

Ler mais →
v0.25.1

A steadier Azure DevOps experience

One guided Configure fields flow. Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in. Steadier sync prog…

Ler mais →
v0.25.0

Smoother scheduling, Azure setup, and project settings

Task creation and deletion feel immediate. Add or remove tasks without waiting for the network; pending changes stay safely visible if a connection is slow. Dependencies now respect working days. When Auto-r…

Ler mais →
v0.24.0

Map Azure DevOps states to your own statuses

Map Azure states to your own statuses. Each Azure DevOps state maps to one exact project status, per work-item type — so a Bug and a User Story can treat the same state name differently, and custom statuses…

Ler mais →
v0.23.0

Simpler team access management

Invite with the right role. Invite one person at a time as Viewer, Editor, or Admin, with a clear pending status. Manage editor access. See who is using editor access, including pending invitations, and swit…

Ler mais →
v0.22.0

A smoother way to create projects

Sign in with GitHub. Use your GitHub account to sign in or create your GanttFather account. Plan first, then check out. Choose how to start, name your project, set its dates, and review the plan before addin…

Ler mais →
v0.21.0

Dependencies keep downstream work on schedule

Parent dependencies now reschedule the complete subtree. When a Story, Feature, or Epic moves, an FS dependency shifts downstream summaries and children together, forward or backward, while preserving the ex…

Ler mais →
v0.20.0

Start every project with a proven plan

Explore the new Template Library. Start with one of 100 ready-to-use project plans for software delivery, marketing, client work, events, operations, and more. Every template includes tasks, milestones, depe…

Ler mais →

julho de 2026

17 releases
v0.19.0

Permanent project deletion

Start fresh with permanent project deletion. Project owners can confirm a project's exact name to erase its tasks, history, comments, invitations, reports, and collaborator access. The project slot is freed…

Ler mais →
v0.18.1

Hierarchical Azure DevOps queries import correctly

Hierarchical Azure DevOps queries now import your work items. Saved queries built as "Tree of work items" or "Work items and direct links" previously finished without importing anything. GanttFather now read…

Ler mais →
v0.18.0

A guided start, clearer planning, and deeper Azure sync

A complete onboarding journey. Tailor your starting point, then create a blank project, preview a template, import an existing plan, or connect Azure DevOps through a guided flow. Safer project setup. Interr…

Ler mais →
v0.17.3

Faster editing and easier controls

Faster task editing. Changes save more smoothly, including titles, descriptions, and progress. Easier project tools. Reports, imports, exports, and Azure DevOps sync now live together in Data & sync. Better…

Ler mais →
v0.17.2

Faster, smoother reports

Reports and dashboards load faster, especially for larger projects. Keep working while reports are prepared. You will be notified when your file is ready to download. Find every update in one place. Report p…

Ler mais →
v0.17.1

Reliability fixes

Project creation works consistently. Available project spaces now appear correctly in the sidebar. Projects are easier to find. Sidebar projects now appear in alphabetical order. Generated reports stay reada…

Ler mais →
v0.17.0

Reports & dashboards

Introducing Reports & dashboards. Explore project health, progress, workload, risks, trends, and task details in a dedicated reporting workspace. Create the report you need. Choose an Executive summary, Deta…

Ler mais →
v0.16.5

Azure DevOps force updates

Confirm updates that need review. Select individual tasks or all visible tasks to publish the reviewed GanttFather values to Azure DevOps. Date updates preserve Azure times. GanttFather changes only the mapp…

Ler mais →
v0.16.4

Two-way Azure DevOps sync

Review and publish changes to Azure DevOps. See the exact dates and estimates that will change, leave out any work item you do not want to update, and confirm only the reviewed changes. Use the same Azure fi…

Ler mais →
v0.16.3

Flexible Azure DevOps imports

Azure fields can now be mapped per work item type. Choose the Start, End, and Estimation fields that each Azure DevOps work item uses, including custom process fields. Imports can be limited to the work item…

Ler mais →
v0.16.2

Multiple task assignees

Tasks can now have multiple assignees. Assign people, agents, and resources together without replacing the existing owner. Task details show the full assignment list. The detail panel now lists every assigne…

Ler mais →
v0.16.1

Spectator and metrics polish

Shared links now follow your canvas theme. Spectator views use the same White, Bone, or Dark canvas as the main Gantt chart, so public read-only schedules no longer feel visually out of sync. The public head…

Ler mais →
v0.16.0

Weekly status emails

Weekly project status emails. Each project can send a once-a-week email — overall progress and how much it moved this week, what's overdue, and what's due next. A clear, scannable snapshot without opening th…

Ler mais →
v0.15.0

The GanttFather API

Build on GanttFather with the new REST API. Everything you do in the app — create tasks, update status and dates, manage dependencies and resources — you can now do from your own code, scripts, and automatio…

Ler mais →
v0.14.0

The task panel, redesigned

Adaptive compact panel. Narrow the panel and Status becomes a glanceable shape (○ open, ◐ in progress, ✓ done) and Assigned a single avatar — task names keep the room. Double-click the divider to fit your lo…

Ler mais →
v0.13.0

GanttFather speaks 10 languages

Five new languages. GanttFather is now available in Deutsch, 日本語, 한국어, Bahasa Indonesia, and हिन्दी — alongside English, Español, Français, Português, and Italiano. The whole app is translated, and welcome e…

Ler mais →
v0.12.1

Your AI agents are now teammates you can see

AI agents show up as real teammates. When an AI assistant works in your project through a connector, it now appears with its own name and a friendly avatar — no more mysterious "Unknown". Its work is easy to…

Ler mais →

junho de 2026

12 releases
v0.11.1

Task descriptions feel smoother — and your board is quieter

Click anywhere to start writing. The whole description area is now active — click anywhere in the box and your cursor lands there, ready to type. No more aiming for the exact first line. Your text starts at…

Ler mais →
v0.11.0

Rich task descriptions — write real docs, right inside your tasks

A real editor, not a plain text box. Task descriptions now format as you type — headings, bold, italic, strikethrough, bulleted and numbered lists, quotes, and links — no syntax to remember. Type / for anyth…

Ler mais →
v0.10.0

Simpler, more predictable pricing — built around projects and editors

Free to start, free to stay. Create a project for free, with you plus 2 editor seats included at no cost. Viewers and guests are always free and unlimited — invite as many people to follow along as you like.…

Ler mais →
v0.9.1

AI assistants can now manage dependencies and keep your plan current

Your AI assistant can now manage task dependencies. A connected AI assistant can add, change and remove the links between tasks — and it follows the same rules as the app, so it won't create links that would…

Ler mais →
v0.9.0

Host teammates on your slots

Host a teammate on your slot. When you invite someone to edit a project you own, your slot now covers them — so they can start editing right away without spending one of their own. It's the simplest way to c…

Ler mais →
v0.8.1

Italiano is here — and invitations now speak your language

Italian joins the lineup. Pick "Italiano" from the language switcher and the whole app — menus, task fields, tooltips, onboarding, billing, project health and release notes — switches to Italian. Dates, week…

Ler mais →
v0.8.0

The Agent Release — plan with AI, across every project

GanttFather now works hand‑in‑hand with AI assistants — Claude, ChatGPT, Cursor, and other AI tools you may already use. Connect once and your assistant can read your projects, build and adjust plans, and sh…

Ler mais →
v0.7.0

Custom Task Statuses, the New Excel Import/Export & Smarter Collaboration Limits

Custom Task Statuses — Your workflow, your words. Manage everything from Settings → Task statuses. Define your own statuses: rename "In Progress" to "In Development", add "In Testing" or "Blocked", pick a co…

Ler mais →
v0.6.0

Project Archives & Unified Settings

Cold Storage for Deleted Projects: Deleting a project no longer destroys it instantly. Instead, it is safely moved to a read-only "Archived" state for 30 days. During this window, you can review its contents…

Ler mais →
v0.5.2

End dates now display inclusively across all views

End dates are now intuitive. The Gantt chart bars, date pickers, Kanban boards, and List views now accurately display the final working day of a task instead of stopping a day early. Excel exports match the…

Ler mais →
v0.5.1

Accurate working days, durations, and weekend shading in every time zone

Working-day counts are correct in every time zone. Tasks that span a weekend or non-working day now show the right number of working days, wherever you are. Previously some time zones could shift the working…

Ler mais →
v0.5.0

Project versioning — save, preview, and restore snapshots of your entire project

Capture, browse, and restore complete project snapshots. Every task, dependency, and assignment is saved — not just what changed, but the full state at that moment. Manual — Open Change History (clock icon),…

Ler mais →

maio de 2026

7 releases
v0.4.0

Automatic dependency scheduling

Tasks now move automatically when their predecessors change. Creating a Finish-to-Start dependency or dragging a predecessor forward will push successor tasks to respect the constraint — just like MS Project…

Ler mais →
v0.3.2

AI agent setup fix, authorization hardening, and crash recovery

Fixed AI agent connection failures caused by mismatched config snippets. The configuration blocks in Settings → MCP & AI Agents now show the correct JSON structure for each editor — Claude Code, Cursor, VS C…

Ler mais →
v0.3.1

Calendar consistency and UI bug fixes

Consistent duration display in Kanban Board. Task cards on the Kanban board now calculate and display the duration accounting for working days vs calendar days, staying in sync with the Gantt Chart calculati…

Ler mais →
v0.3.0

Team Calendar, working schedules, and smart duration tracking

Configure which days of the week your team works. Open the Team tab to select working days — no longer limited to Monday through Friday. Three-day weeks, weekend shifts, and any custom pattern are now suppor…

Ler mais →
v0.2.6

Inline task creation from the Gantt list, plus a smoother onboarding tour

Hover over a task group to reveal an "Add subtask" button. When your mouse is over a parent task and its children, a "+" row appears at the end of the group so you can add a subtask right where it belongs. H…

Ler mais →
v0.2.5

Smoother Gantt table resizing, polished sidebar, and a refreshed look

Resize the task panel from anywhere along its edge. The right border of the task list is now draggable in both the header and the body, not just below the column labels. Column edges are easier to see and gr…

Ler mais →
v0.2.4

Project preferences, safer task colors, and sturdier team details

Project preferences are now easier to find. Project Settings starts with display preferences, and the new section index lets you jump straight to Preferences, Azure DevOps, MCP agents, ownership transfer, su…

Ler mais →

abril de 2026

9 releases
v0.2.3

Pick your canvas: themes, dark mode and a calmer app

Theme picker in Preferences. Settings → Appearance is now Preferences and ships with a theme selector: White for a crisp background, Bone (default) for the new warmer canvas, and Dark for low-light sessions.…

Ler mais →
v0.2.0

Slot-based plans, referral bonuses and a refreshed Settings experience

Minimalist UI/UX across Settings. Profile, Project Settings, Billing, Privacy and Release Notes now share one quiet layout — cleaner sidebar, restrained typography, less visual noise. Everything where you ex…

Ler mais →
v0.1.5

Scrollable profile, section shortcuts, and a cleaner Metrics diagnostic panel

Section shortcuts in Profile and Project Settings. A floating index on the right lets you jump straight to Personal Information, Email, Account Details, Sign Out, or Delete Account in your profile — and to A…

Ler mais →
v0.1.2

Clearer consent for our legal terms, plus access fixes

Terms, Privacy and Cookies consent is now tracked. When you sign up, your acceptance is recorded along with the version you agreed to. If we later publish materially updated terms, a short prompt will ask yo…

Ler mais →
v0.1.1

Release notes, ownership transfer fix, and clearer errors

Release notes in the app. Catch up on what's new in GanttFather without leaving the app. Each version is grouped by month, and a floating index on the right lets you jump between months at a glance. Clearer…

Ler mais →
v0.1.0

Smarter assignment, drag-and-drop fixes, and Critical Path

Assignee picker now lists people alphabetically. New Critical Path view that computes the longest dependency chain per task group. Added a tooltip on the Critical Path button explaining what it does. Fixed o…

Ler mais →
v0.0.12

Share pages speak your language

Public share (spectator) pages now include a language switcher — stakeholders can read your plan in English, Spanish or French without signing in. Dates on public share links are now rendered correctly regar…

Ler mais →
v0.0.11

Dependencies you can draw and tighter hover controls

Full dependency management directly on the Gantt — create, edit and remove links between tasks with visual connectors instead of opening a form. Hover controls on task bars let you add a subtask, resize or o…

Ler mais →
v0.0.10

Reliable reordering and a visible sync status

New sync status bar tells you at a glance whether changes are queued, syncing or safely saved. Edits keep going when your connection drops — pending changes flush automatically once you're back online. Reord…

Ler mais →

março de 2026

1 releases

Precisa de ajuda?

Fale com nossa equipe — ficaremos felizes em ajudar.

[email protected]