← Voltar para Novidades
v0.13.0

GanttFather speaks 10 languages

Features

  • Five new languages. GanttFather is now available in Deutsch, 日本語, 한국어, Bahasa Indonesia, and हिन्दी — alongside English, Español, Français, Português, and Italiano. The whole app is translated, and welcome emails arrive in your language too. Switch anytime from the new account menu.
  • Your account, one click away. Your avatar now lives at the bottom of the sidebar. Click it for Settings, the language picker, all plans, What’s new, and Log out — no more digging through Settings tabs for account actions.
  • What’s new, right here. Release notes now open in a quick dialog with the latest updates instead of taking you to a separate page. A small dot on your avatar tells you when there’s something new.
  • Clearer path when you hit your project limit. If you’re at capacity, Billing now tells you exactly where you stand — projects and editor seats at a glance — with a one-click way to add a project. Yearly billing (50% off) is now the default, with monthly one click away.
  • Know what sharing does before you click. The Share button now explains itself: it creates a public link anyone can view — no account needed.

Bug Fixes

  • No more double terms prompt. New accounts were sometimes asked to accept the Terms again right after accepting them during sign-up. Accept once on the form and you’re in.
  • Excel export never fails silently. If an export or template download can’t start, you now see a clear message and can retry — instead of a button that just stopped responding.
  • Smoother updates. Right after we ship a new version, open tabs now refresh themselves once instead of occasionally showing a broken page or a dead button.
  • Tooltips stay visible. Toolbar tips (Excel, Critical Path) no longer get clipped by the edge of the panel, and the account menu always appears above your charts.

Teste o GanttFather grátis

Todas as funcionalidades incluídas — Gantt, Kanban, dependências, caminho crítico, sync em tempo real, Excel, agentes IA. O plano grátis inclui 1 projeto seu, 2 assentos de editor e visualizadores e convidados ilimitados.

Começar grátis