← Volver a Novedades
v0.13.0

GanttFather speaks 10 languages

Features

  • Five new languages. GanttFather is now available in Deutsch, 日本語, 한국어, Bahasa Indonesia, and हिन्दी — alongside English, Español, Français, Português, and Italiano. The whole app is translated, and welcome emails arrive in your language too. Switch anytime from the new account menu.
  • Your account, one click away. Your avatar now lives at the bottom of the sidebar. Click it for Settings, the language picker, all plans, What’s new, and Log out — no more digging through Settings tabs for account actions.
  • What’s new, right here. Release notes now open in a quick dialog with the latest updates instead of taking you to a separate page. A small dot on your avatar tells you when there’s something new.
  • Clearer path when you hit your project limit. If you’re at capacity, Billing now tells you exactly where you stand — projects and editor seats at a glance — with a one-click way to add a project. Yearly billing (50% off) is now the default, with monthly one click away.
  • Know what sharing does before you click. The Share button now explains itself: it creates a public link anyone can view — no account needed.

Bug Fixes

  • No more double terms prompt. New accounts were sometimes asked to accept the Terms again right after accepting them during sign-up. Accept once on the form and you’re in.
  • Excel export never fails silently. If an export or template download can’t start, you now see a clear message and can retry — instead of a button that just stopped responding.
  • Smoother updates. Right after we ship a new version, open tabs now refresh themselves once instead of occasionally showing a broken page or a dead button.
  • Tooltips stay visible. Toolbar tips (Excel, Critical Path) no longer get clipped by the edge of the panel, and the account menu always appears above your charts.

Prueba GanttFather gratis

Cada función incluida — Gantt, Kanban, dependencias, ruta crítica, sync en tiempo real, Excel, agentes IA. El plan gratuito incluye 1 proyecto propio, 2 editor seats y espectadores e invitados ilimitados.

Empieza gratis