← नया क्या है पर वापस जाएँ
v0.1.5

Scrollable profile, section shortcuts, and a cleaner Metrics diagnostic panel

Features

  • Section shortcuts in Profile and Project Settings. A floating index on the right lets you jump straight to Personal Information, Email, Account Details, Sign Out, or Delete Account in your profile — and to Azure DevOps, MCP & AI Agents, Ownership Transfer, or Delete Project in settings. The active section highlights as you scroll.
  • “Need help?” card in Profile, Project Settings and Release Notes. Each of these views now ends with a dedicated card linking to [email protected], so reaching the team is always one click away.

Bug Fixes

  • “Need help?” now appears in the Release Notes floating index. The side navigation in Release Notes listed months only; you can now jump straight to the support card from the same index used in Profile and Project Settings.
  • Real-time collaboration indicator no longer covers top-bar buttons. When live collaboration briefly disconnects on a shared project, the small indicator now sits in the bottom-right corner instead of overlapping Export, Report and other top-bar actions.
  • Solo projects no longer open a real-time connection. If you’re the only member of a project, the app skips the collaboration channel entirely — faster startup, lighter on battery, and the “disconnected” indicator never appears when there’s nobody to collaborate with.
  • Profile page now scrolls. The profile view was cut off on shorter windows, hiding Account Details, Sign Out and Delete Account. You can now scroll through the full page.
  • Metrics diagnostic panel respects your language. The “Diagnostic & Recovery” header, the “Where is the GAP?” subtitle and the “Attention Required” / “Healthy” status badges showed in Spanish regardless of the selected language. They now translate correctly in English, Spanish and French.

Try GanttFather free

Every feature included — Gantt, Kanban, dependencies, critical path, real-time sync, Excel, AI agents. Free tier includes 1 project you own, 2 editor seats, and unlimited viewers and guests.

Start free