---
title: "更新日志 · v0.16.4 · GanttFather"
description: "更新日志 v0.16.4: Two-way Azure DevOps sync. 发布于 2026年7月19日."
canonical: "https://ganttfather.com/zh/releases/2026-07-19-v0.16.4/"
locale: "zh"
category: "history"
---

# 更新日志 · v0.16.4 · GanttFather

[← 返回更新日志](https://ganttfather.com/zh/releases/)
v0.16.4 发布于 2026年7月19日

# Two-way Azure DevOps sync

 Copy as Markdown | [View as Markdown](https://ganttfather.com/zh/releases/2026-07-19-v0.16.4/index.md)

## New

- **Review and publish changes to Azure DevOps.** See the exact dates and estimates that will change, leave out any work item you do not want to update, and confirm only the reviewed changes.

- **Use the same Azure fields in both directions.** Map Start, End, and Estimation for each work item type, including custom process fields, and reuse those mappings for imports and updates.

## Improved

- **Azure syncs include recovery checkpoints.** GanttFather checks the latest Azure values before publishing, confirms the saved result afterward, and creates a restorable history checkpoint before every pull or push.

## Bug Fixes

- **Changed field mappings now take effect on the next pull.** Newly selected Azure date fields update Gantt tasks while pending local edits remain protected for review.

- **Dates and estimates stay consistent.** Story Points and other mapped estimates sync correctly, Azure finish dates remain accurate, and a pull no longer creates false conflicts before a push.

## 免费试用 GanttFather

 包含所有功能——甘特图、看板、依赖关系、关键路径、实时同步、Excel、AI 代理。免费计划包含 1 个你拥有的项目、2 个编辑席位，以及无限查看者和访客。

 [免费开始](https://app.ganttfather.com/login) [查看定价](https://ganttfather.com/zh/pricing/)
