---
title: "更新日志 · v0.16.2 · GanttFather"
description: "更新日志 v0.16.2: Multiple task assignees. 发布于 2026年7月9日."
canonical: "https://ganttfather.com/zh/releases/2026-07-09-v0.16.2/"
locale: "zh"
category: "history"
---

# 更新日志 · v0.16.2 · GanttFather

[← 返回更新日志](https://ganttfather.com/zh/releases/)
v0.16.2 发布于 2026年7月9日

# Multiple task assignees

 Copy as Markdown | [View as Markdown](https://ganttfather.com/zh/releases/2026-07-09-v0.16.2/index.md)

## Improved

- **Tasks can now have multiple assignees.** Assign people, agents, and resources together without replacing the existing owner.

- **Task details show the full assignment list.** The detail panel now lists every assigned person, agent, and resource instead of hiding extras behind a count.

- **Task details now show creation context.** Fullscreen task details include the task creation date and creator avatar when that audit data is available.

- **Assignees are clearer across every view.** Gantt, List, and Board keep stacked avatars with overflow counts and full hover labels, and parent Gantt bars now show their assignees at the end of the bar.

## Bug Fixes

- **Old assignee references no longer block updates.** If a task still has a stale assignment ID, saving the assignee picker filters it out instead of preventing valid changes.

- **Gantt date resizing stays recoverable.** Dragging a task’s end before its start now clamps to the smallest usable duration — one hour in Hours view, one day in the other timeline views — so the task never collapses into an uneditable sliver.

## 免费试用 GanttFather

 包含所有功能——甘特图、看板、依赖关系、关键路径、实时同步、Excel、AI 代理。免费计划包含 1 个你拥有的项目、2 个编辑席位，以及无限查看者和访客。

 [免费开始](https://app.ganttfather.com/login) [查看定价](https://ganttfather.com/zh/pricing/)
