---
title: "更新日志 · v0.16.1 · GanttFather"
description: "更新日志 v0.16.1: Spectator and metrics polish. 发布于 2026年7月7日."
canonical: "https://ganttfather.com/zh/releases/2026-07-07-v0.16.1/"
locale: "zh"
category: "history"
---

# 更新日志 · v0.16.1 · GanttFather

[← 返回更新日志](https://ganttfather.com/zh/releases/)
v0.16.1 发布于 2026年7月7日

# Spectator and metrics polish

 Copy as Markdown | [View as Markdown](https://ganttfather.com/zh/releases/2026-07-07-v0.16.1/index.md)

## Improved

- **Shared links now follow your canvas theme.** Spectator views use the same White, Bone, or Dark canvas as the main Gantt chart, so public read-only schedules no longer feel visually out of sync.

- **The public header matches the app brand.** The GanttFather wordmark in spectator mode now uses the same black sidebar styling instead of the older blue treatment.

- **Metrics stay in the selected language.** The Metrics tab now refreshes generated diagnostics when you switch languages, including labels such as failed kickoff, stagnation, blockers, unblock actions, backlog cleanup, and critical-delay prevention.

- **Metrics copy is fully keyed for translation.** Formulas, SPI target text, recommendation types, and impact badges now use the app translation files so English and localized views stay consistent.

## 免费试用 GanttFather

 包含所有功能——甘特图、看板、依赖关系、关键路径、实时同步、Excel、AI 代理。免费计划包含 1 个你拥有的项目、2 个编辑席位，以及无限查看者和访客。

 [免费开始](https://app.ganttfather.com/login) [查看定价](https://ganttfather.com/zh/pricing/)
