# Project Timeline Templates

Templates

# Start from a plan that already works.

 Ready-made schedules with tasks, dependencies, and realistic durations already in place. Pick one, rename what matters, and you have a working timeline in about a minute.

 100 Templates, all free

 ~60s From pick to plan

 All 100 Software & technology 5 Product & design 5 Marketing & growth 5 Sales & customer success 5 Professional services 5 Business operations 5 Finance & accounting 5 People & HR 5 Events & experiences 5 Construction 5 Engineering & infrastructure 5 Manufacturing & supply chain 5 Education 5 Research 5 Healthcare & life sciences 5 Nonprofit & public sector 5 Legal & compliance 5 Real estate & facilities 5 Creative & media 5 Personal & career 5

 100 templates

 Software & technology

## [Software release](https://ganttfather.com/templates/software-release-timeline/)

 Plan a software release from scope through deployment with a practical 19-working-day schedule.

 7 tasks 7 links 19 working days

 [Use this template](https://ganttfather.com/templates/software-release-timeline/)

 Software & technology

## [Cloud migration](https://ganttfather.com/templates/cloud-migration/)

 Best for moving a defined application or workload portfolio to an approved cloud target with cutover controls.

 8 tasks 9 links 25 working days

 [Use this template](https://ganttfather.com/templates/cloud-migration/)

 Software & technology

## [Mobile app launch](https://ganttfather.com/templates/mobile-app-launch/)

 Best for preparing one mobile app release for store submission, publication, and launch checks.

 7 tasks 7 links 19 working days

 [Use this template](https://ganttfather.com/templates/mobile-app-launch/)

 Software & technology

## [SaaS MVP](https://ganttfather.com/templates/saas-mvp/)

 Best for building a bounded SaaS minimum viable product for an initial validation cohort.

 7 tasks 8 links 22 working days

 [Use this template](https://ganttfather.com/templates/saas-mvp/)

 Software & technology

## [Website redesign](https://ganttfather.com/templates/website-redesign/)

 Best for replacing an existing website through discovery, design, migration, testing, and launch.

 7 tasks 7 links 24 working days

 [Use this template](https://ganttfather.com/templates/website-redesign/)

 Product & design

## [Brand identity design](https://ganttfather.com/templates/brand-identity-design/)

 Best for coordinating a bounded Brand identity design project from Align brand brief through Package brand guidelines.

 5 tasks 5 links 20 working days

 [Use this template](https://ganttfather.com/templates/brand-identity-design/)

 Product & design

## [Design system rollout](https://ganttfather.com/templates/design-system-rollout/)

 Best for coordinating a bounded Design system rollout project from Audit interface inventory through Migrate target surfaces.

 5 tasks 5 links 23 working days

 [Use this template](https://ganttfather.com/templates/design-system-rollout/)

 Product & design

## [New product development](https://ganttfather.com/templates/new-product-development/)

 Best for coordinating a bounded New product development project from Define product scope through Prepare launch handoff.

 5 tasks 5 links 22 working days

 [Use this template](https://ganttfather.com/templates/new-product-development/)

 Product & design

## [Product discovery sprint](https://ganttfather.com/templates/product-discovery-sprint/)

 Best for coordinating a bounded Product discovery sprint project from Frame product opportunity through Choose product direction.

 5 tasks 5 links 18 working days

 [Use this template](https://ganttfather.com/templates/product-discovery-sprint/)

 Product & design

## [UX research](https://ganttfather.com/templates/ux-research/)

 Best for coordinating a bounded UX research project from Define research questions through Deliver product recommendations.

 5 tasks 5 links 17 working days

 [Use this template](https://ganttfather.com/templates/ux-research/)

 Marketing & growth

## [Marketing campaign](https://ganttfather.com/templates/marketing-campaign-timeline/)

 Coordinate brief, creative, launch QA, and performance review in a practical campaign schedule.

 8 tasks 9 links 24 working days

 [Use this template](https://ganttfather.com/templates/marketing-campaign-timeline/)

 Marketing & growth

## [Email marketing campaign](https://ganttfather.com/templates/email-marketing-campaign/)

 Best for planning and sending one email campaign from audience definition through delivery review.

 5 tasks 5 links 16 working days

 [Use this template](https://ganttfather.com/templates/email-marketing-campaign/)

 Marketing & growth

## [Paid advertising campaign](https://ganttfather.com/templates/paid-advertising-campaign/)

 Best for launching one paid campaign with a defined audience, budget, creative review, and first optimization check.

 5 tasks 5 links 18 working days

 [Use this template](https://ganttfather.com/templates/paid-advertising-campaign/)

 Marketing & growth

## [Product launch campaign](https://ganttfather.com/templates/product-launch-campaign/)

 Best for coordinating the marketing campaign for one product release from launch narrative through the first readout.

 5 tasks 5 links 20 working days

 [Use this template](https://ganttfather.com/templates/product-launch-campaign/)

 Marketing & growth

## [SEO content cluster](https://ganttfather.com/templates/seo-content-cluster/)

 Best for producing one search-led topic cluster from intent mapping through linked publication.

 5 tasks 5 links 20 working days

 [Use this template](https://ganttfather.com/templates/seo-content-cluster/)

 Sales & customer success

## [CRM implementation](https://ganttfather.com/templates/crm-implementation/)

 Best for implementing one CRM instance through approved scope, data preparation, configuration, testing, training, and adoption verification.

 8 tasks 8 links 21 working days

 [Use this template](https://ganttfather.com/templates/crm-implementation/)

 Sales & customer success

## [Customer onboarding](https://ganttfather.com/templates/customer-onboarding/)

 Best for activating one newly contracted customer from sales handoff through an agreed onboarding-complete decision.

 8 tasks 9 links 19 working days

 [Use this template](https://ganttfather.com/templates/customer-onboarding/)

 Sales & customer success

## [Customer implementation](https://ganttfather.com/templates/customer-implementation/)

 Best for configuring and deploying one purchased solution through customer acceptance and transition to steady-state support.

 8 tasks 8 links 22 working days

 [Use this template](https://ganttfather.com/templates/customer-implementation/)

 Sales & customer success

## [RFP response](https://ganttfather.com/templates/rfp-response/)

 Best for producing one compliant request-for-proposal response through qualification, drafting, approval, and submission.

 9 tasks 10 links 16 working days

 [Use this template](https://ganttfather.com/templates/rfp-response/)

 Sales & customer success

## [Sales territory planning](https://ganttfather.com/templates/sales-territory-planning/)

 Best for defining account and geographic coverage for one named sales planning period through approved territory assignments.

 8 tasks 8 links 16 working days

 [Use this template](https://ganttfather.com/templates/sales-territory-planning/)

 Professional services

## [Client delivery](https://ganttfather.com/templates/client-delivery-plan/)

 Manage discovery, delivery, review, and handoff with a client-facing project timeline.

 7 tasks 9 links 25 working days

 [Use this template](https://ganttfather.com/templates/client-delivery-plan/)

 Professional services

## [Agency website project](https://ganttfather.com/templates/agency-website-project/)

 Best for delivering one client website through approved strategy, production, client validation, and launch handoff.

 10 tasks 10 links 24 working days

 [Use this template](https://ganttfather.com/templates/agency-website-project/)

 Professional services

## [Consulting engagement](https://ganttfather.com/templates/consulting-engagement/)

 Best for completing one advisory engagement from diagnosis through an accepted recommendation and client handoff.

 9 tasks 9 links 21 working days

 [Use this template](https://ganttfather.com/templates/consulting-engagement/)

 Professional services

## [Freelance client project](https://ganttfather.com/templates/freelance-client-project/)

 Best for completing one scoped freelance client project through quote approval, focused production, review, and final handoff.

 8 tasks 8 links 19 working days

 [Use this template](https://ganttfather.com/templates/freelance-client-project/)

 Professional services

## [Software implementation consulting](https://ganttfather.com/templates/software-implementation-consulting/)

 Best for consulting on one software implementation from discovery through configured-solution acceptance and transition support.

 9 tasks 9 links 23 working days

 [Use this template](https://ganttfather.com/templates/software-implementation-consulting/)

 Business operations

## [Annual operating plan](https://ganttfather.com/templates/annual-operating-plan/)

 Plan one annual operating plan with clear owners, dependencies, approvals, and a finite completion point.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/annual-operating-plan/)

 Business operations

## [Business process improvement](https://ganttfather.com/templates/business-process-improvement/)

 Plan one business process improvement with clear owners, dependencies, approvals, and a finite completion point.

 7 tasks 8 links 19 working days

 [Use this template](https://ganttfather.com/templates/business-process-improvement/)

 Business operations

## [Office relocation](https://ganttfather.com/templates/office-relocation/)

 Plan one office relocation with clear owners, dependencies, approvals, and a finite completion point.

 7 tasks 8 links 20 working days

 [Use this template](https://ganttfather.com/templates/office-relocation/)

 Business operations

## [Quarterly planning](https://ganttfather.com/templates/quarterly-planning/)

 Plan one quarterly planning with clear owners, dependencies, approvals, and a finite completion point.

 6 tasks 6 links 15 working days

 [Use this template](https://ganttfather.com/templates/quarterly-planning/)

 Business operations

## [Vendor selection and onboarding](https://ganttfather.com/templates/vendor-selection-onboarding/)

 Plan one vendor selection and onboarding with clear owners, dependencies, approvals, and a finite completion point.

 7 tasks 7 links 18 working days

 [Use this template](https://ganttfather.com/templates/vendor-selection-onboarding/)

 Finance & accounting

## [Annual budgeting](https://ganttfather.com/templates/annual-budgeting/)

 Build one approved annual budget baseline by sequencing fiscal assumptions, department inputs, trade-off review, and approval.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/annual-budgeting/)

 Finance & accounting

## [Financial audit readiness](https://ganttfather.com/templates/financial-audit-readiness/)

 Prepare one defined audit-period readiness package by assigning evidence owners, organizing requested support, and documenting a handoff.

 7 tasks 7 links 14 working days

 [Use this template](https://ganttfather.com/templates/financial-audit-readiness/)

 Finance & accounting

## [Monthly financial close](https://ganttfather.com/templates/monthly-financial-close/)

 Coordinate one named accounting-period close with a bounded sequence for inputs, reconciliations, review, and documented completion.

 7 tasks 8 links 13 working days

 [Use this template](https://ganttfather.com/templates/monthly-financial-close/)

 Finance & accounting

## [Payroll implementation](https://ganttfather.com/templates/payroll-implementation/)

 Plan one payroll platform or provider implementation with visible configuration, validation, training, and first-period support handoffs.

 7 tasks 7 links 16 working days

 [Use this template](https://ganttfather.com/templates/payroll-implementation/)

 Finance & accounting

## [Fundraising round](https://ganttfather.com/templates/fundraising-round/)

 Coordinate one company financing round by sequencing internal preparation, conversation logistics, diligence requests, and a documented close-or-pause decision.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/fundraising-round/)

 People & HR

## [Employee onboarding](https://ganttfather.com/templates/employee-onboarding/)

 Best for completing onboarding for one defined employee cohort with visible handoffs.

 7 tasks 8 links 15 working days

 [Use this template](https://ganttfather.com/templates/employee-onboarding/)

 People & HR

## [Employee training rollout](https://ganttfather.com/templates/employee-training-rollout/)

 Best for delivering one approved employee training program to a defined audience.

 7 tasks 7 links 21 working days

 [Use this template](https://ganttfather.com/templates/employee-training-rollout/)

 People & HR

## [HRIS implementation](https://ganttfather.com/templates/hris-implementation/)

 Best for transitioning one defined HRIS scope from approved design through operational handoff.

 7 tasks 7 links 18 working days

 [Use this template](https://ganttfather.com/templates/hris-implementation/)

 People & HR

## [Performance review cycle](https://ganttfather.com/templates/performance-review-cycle/)

 Best for closing one defined performance-review window with visible completion checkpoints.

 7 tasks 7 links 20 working days

 [Use this template](https://ganttfather.com/templates/performance-review-cycle/)

 People & HR

## [Recruitment and hiring](https://ganttfather.com/templates/recruitment-hiring/)

 Best for closing one defined hiring cycle with structured coordination and a documented handoff.

 7 tasks 7 links 19 working days

 [Use this template](https://ganttfather.com/templates/recruitment-hiring/)

 Events & experiences

## [Event plan](https://ganttfather.com/templates/event-planning-timeline/)

 Plan an event from goals and venue through readiness, event day, follow-up, and retrospective.

 9 tasks 9 links 26 working days

 [Use this template](https://ganttfather.com/templates/event-planning-timeline/)

 Events & experiences

## [Conference planning](https://ganttfather.com/templates/conference-planning/)

 Best for delivering one multi-session conference with speakers, registration, production, and attendee follow-up.

 7 tasks 8 links 22 working days

 [Use this template](https://ganttfather.com/templates/conference-planning/)

 Events & experiences

## [Trade show planning](https://ganttfather.com/templates/trade-show-planning/)

 Best for preparing one exhibitor presence with booth, logistics, staffing, promotion, and lead handoff.

 9 tasks 10 links 22 working days

 [Use this template](https://ganttfather.com/templates/trade-show-planning/)

 Events & experiences

## [Webinar production](https://ganttfather.com/templates/webinar-production/)

 Best for producing one live or recorded webinar from topic approval through rehearsal, broadcast, and follow-up.

 8 tasks 8 links 18 working days

 [Use this template](https://ganttfather.com/templates/webinar-production/)

 Events & experiences

## [Wedding planning](https://ganttfather.com/templates/wedding-planning/)

 Best for planning one wedding from venue and vendor decisions through ceremony readiness and closeout.

 7 tasks 9 links 23 working days

 [Use this template](https://ganttfather.com/templates/wedding-planning/)

 Construction

## [Construction closeout](https://ganttfather.com/templates/construction-closeout/)

 Plan one construction closeout project with confirm substantial-completion scope, resolve defined punch-list items, and a clear handover.

 7 tasks 8 links 13 working days

 [Use this template](https://ganttfather.com/templates/construction-closeout/)

 Construction

## [Commercial construction](https://ganttfather.com/templates/commercial-construction/)

 Plan one commercial construction project with confirm approved commercial scope, coordinate structure and building systems, and a clear handover.

 7 tasks 8 links 21 working days

 [Use this template](https://ganttfather.com/templates/commercial-construction/)

 Construction

## [Home renovation](https://ganttfather.com/templates/home-renovation/)

 Plan one home renovation project with confirm approved renovation scope, coordinate demolition and trade work, and a clear handover.

 7 tasks 8 links 16 working days

 [Use this template](https://ganttfather.com/templates/home-renovation/)

 Construction

## [Preconstruction](https://ganttfather.com/templates/preconstruction/)

 Plan one preconstruction project with confirm candidate project scope, coordinate design inputs, and a clear handover.

 7 tasks 8 links 15 working days

 [Use this template](https://ganttfather.com/templates/preconstruction/)

 Construction

## [Residential construction](https://ganttfather.com/templates/residential-construction/)

 Plan one residential construction project with confirm approved residential scope, complete foundation and structural work, and a clear handover.

 7 tasks 8 links 19 working days

 [Use this template](https://ganttfather.com/templates/residential-construction/)

 Engineering & infrastructure

## [Civil engineering project](https://ganttfather.com/templates/civil-engineering/)

 Best for coordinating one defined civil engineering project from an agreed scope through a documented planning handoff.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/civil-engineering/)

 Engineering & infrastructure

## [Engineering design review](https://ganttfather.com/templates/engineering-design-review/)

 Best for coordinating one defined engineering design review from an agreed scope through a documented planning handoff.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/engineering-design-review/)

 Engineering & infrastructure

## [Infrastructure project](https://ganttfather.com/templates/infrastructure-project/)

 Best for coordinating one defined infrastructure project from an agreed scope through a documented planning handoff.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/infrastructure-project/)

 Engineering & infrastructure

## [Road construction project](https://ganttfather.com/templates/road-construction/)

 Best for coordinating one defined road construction project from an agreed scope through a documented planning handoff.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/road-construction/)

 Engineering & infrastructure

## [Solar installation project](https://ganttfather.com/templates/solar-installation/)

 Best for coordinating one defined solar installation project from an agreed scope through a documented planning handoff.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/solar-installation/)

 Manufacturing & supply chain

## [Manufacturing launch](https://ganttfather.com/templates/manufacturing-launch/)

 Best for launching manufacture of one approved product or major variant through process readiness, pilot builds, quality gates, and a documented production release.

 7 tasks 8 links 18 working days

 [Use this template](https://ganttfather.com/templates/manufacturing-launch/)

 Manufacturing & supply chain

## [Production line setup](https://ganttfather.com/templates/production-line-setup/)

 Best for installing and validating one production line or major cell through layout, equipment, utilities, commissioning, and operator readiness.

 7 tasks 8 links 19 working days

 [Use this template](https://ganttfather.com/templates/production-line-setup/)

 Manufacturing & supply chain

## [Supplier onboarding](https://ganttfather.com/templates/supplier-onboarding/)

 Best for qualifying and activating one supplier for a defined material or service through evaluation, approval, setup, and first-order readiness.

 7 tasks 8 links 15 working days

 [Use this template](https://ganttfather.com/templates/supplier-onboarding/)

 Manufacturing & supply chain

## [Supply chain redesign](https://ganttfather.com/templates/supply-chain-redesign/)

 Best for redesigning one defined supply network or flow through baseline analysis, scenarios, decisions, pilot preparation, and transition planning.

 7 tasks 8 links 16 working days

 [Use this template](https://ganttfather.com/templates/supply-chain-redesign/)

 Manufacturing & supply chain

## [Warehouse launch](https://ganttfather.com/templates/warehouse-launch/)

 Best for opening one warehouse operation through layout, systems, inventory setup, staffing, testing, and operational cutover.

 7 tasks 8 links 18 working days

 [Use this template](https://ganttfather.com/templates/warehouse-launch/)

 Education

## [Academic semester planning](https://ganttfather.com/templates/academic-semester-planning/)

 Best for completing one bounded academic semester planning project with a visible sequence of decisions and handoffs.

 7 tasks 7 links 15 working days

 [Use this template](https://ganttfather.com/templates/academic-semester-planning/)

 Education

## [Accreditation preparation](https://ganttfather.com/templates/accreditation-preparation/)

 Best for completing one bounded accreditation preparation project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/accreditation-preparation/)

 Education

## [Course development](https://ganttfather.com/templates/course-development/)

 Best for completing one bounded course development project with a visible sequence of decisions and handoffs.

 7 tasks 7 links 15 working days

 [Use this template](https://ganttfather.com/templates/course-development/)

 Education

## [Curriculum redesign](https://ganttfather.com/templates/curriculum-redesign/)

 Best for completing one bounded curriculum redesign project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/curriculum-redesign/)

 Education

## [Online course launch](https://ganttfather.com/templates/online-course-launch/)

 Best for completing one bounded online course launch project with a visible sequence of decisions and handoffs.

 7 tasks 7 links 14 working days

 [Use this template](https://ganttfather.com/templates/online-course-launch/)

 Research

## [Grant proposal](https://ganttfather.com/templates/grant-proposal/)

 Best for developing one grant proposal from a selected opportunity through internal review and a documented submission or withdrawal.

 8 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/grant-proposal/)

 Research

## [Literature review](https://ganttfather.com/templates/literature-review/)

 Best for completing one scoped literature review through protocol, search, screening, synthesis, and a reviewed final artifact.

 8 tasks 8 links 25 working days

 [Use this template](https://ganttfather.com/templates/literature-review/)

 Research

## [Research publication](https://ganttfather.com/templates/research-publication/)

 Best for taking one completed research manuscript through publication planning, review, submission, and a documented finite decision cycle.

 8 tasks 8 links 24 working days

 [Use this template](https://ganttfather.com/templates/research-publication/)

 Research

## [Research study](https://ganttfather.com/templates/research-study/)

 Best for running one bounded research study from a defined question through evidence, findings, and records closeout.

 8 tasks 8 links 25 working days

 [Use this template](https://ganttfather.com/templates/research-study/)

 Research

## [Thesis and dissertation](https://ganttfather.com/templates/thesis-dissertation/)

 Best for planning one thesis or dissertation from an approved proposal through research, drafting, review-ready work, and submission.

 8 tasks 8 links 27 working days

 [Use this template](https://ganttfather.com/templates/thesis-dissertation/)

 Healthcare & life sciences

## [Clinical study closeout](https://ganttfather.com/templates/clinical-study-closeout/)

 Best for coordinating one defined clinical study or site-cohort closeout as an organization-owned planning workflow without medical, clinical, regulatory, or approval guidance.

 7 tasks 8 links 15 working days

 [Use this template](https://ganttfather.com/templates/clinical-study-closeout/)

 Healthcare & life sciences

## [Clinical trial startup](https://ganttfather.com/templates/clinical-trial-startup/)

 Best for coordinating a defined clinical trial or site-cohort startup as an organization-owned planning workflow without medical, clinical, regulatory, or approval guidance.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/clinical-trial-startup/)

 Healthcare & life sciences

## [Healthcare facility opening](https://ganttfather.com/templates/healthcare-facility-opening/)

 Best for coordinating one defined healthcare facility or service-location opening as an organization-owned planning workflow without medical, clinical, regulatory, or approval guidance.

 7 tasks 8 links 16 working days

 [Use this template](https://ganttfather.com/templates/healthcare-facility-opening/)

 Healthcare & life sciences

## [Laboratory accreditation readiness](https://ganttfather.com/templates/laboratory-accreditation/)

 Best for coordinating one named laboratory assessment-readiness project as an organization-owned planning workflow without accreditation, medical, regulatory, or approval guidance.

 7 tasks 8 links 14 working days

 [Use this template](https://ganttfather.com/templates/laboratory-accreditation/)

 Healthcare & life sciences

## [Medical device development](https://ganttfather.com/templates/medical-device-development/)

 Best for coordinating one defined medical-device version as an organization-owned planning workflow through design inputs, review preparation, and transfer readiness without medical, clinical, regulatory, or approval guidance.

 7 tasks 8 links 18 working days

 [Use this template](https://ganttfather.com/templates/medical-device-development/)

 Nonprofit & public sector

## [Fundraising campaign](https://ganttfather.com/templates/fundraising-campaign/)

 Best for completing one bounded fundraising campaign project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/fundraising-campaign/)

 Nonprofit & public sector

## [Grant management cycle](https://ganttfather.com/templates/grant-management/)

 Best for completing one bounded grant management cycle project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 19 working days

 [Use this template](https://ganttfather.com/templates/grant-management/)

 Nonprofit & public sector

## [Nonprofit program launch](https://ganttfather.com/templates/nonprofit-program-launch/)

 Best for completing one bounded nonprofit program launch project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/nonprofit-program-launch/)

 Nonprofit & public sector

## [Public consultation](https://ganttfather.com/templates/public-consultation/)

 Best for completing one bounded public consultation project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/public-consultation/)

 Nonprofit & public sector

## [Volunteer program launch](https://ganttfather.com/templates/volunteer-program/)

 Best for completing one bounded volunteer program launch project with a visible sequence of decisions and handoffs.

 7 tasks 8 links 17 working days

 [Use this template](https://ganttfather.com/templates/volunteer-program/)

 Legal & compliance

## [Contract renewal](https://ganttfather.com/templates/contract-renewal/)

 Best for coordinating one finite contract renewal coordination project with visible inputs, review points, and professional handoffs.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/contract-renewal/)

 Legal & compliance

## [ISO certification readiness coordination](https://ganttfather.com/templates/iso-certification/)

 Best for coordinating one finite iso certification readiness coordination project with visible inputs, review points, and professional handoffs.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/iso-certification/)

 Legal & compliance

## [Policy review and decision cycle](https://ganttfather.com/templates/policy-review-approval/)

 Best for coordinating one finite policy review and decision cycle project with visible inputs, review points, and professional handoffs.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/policy-review-approval/)

 Legal & compliance

## [Privacy coordination readiness](https://ganttfather.com/templates/privacy-compliance/)

 Best for coordinating one finite privacy coordination readiness project with visible inputs, review points, and professional handoffs.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/privacy-compliance/)

 Legal & compliance

## [SOC 2 readiness coordination](https://ganttfather.com/templates/soc2-readiness/)

 Best for coordinating one finite soc 2 readiness coordination project with visible inputs, review points, and professional handoffs.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/soc2-readiness/)

 Real estate & facilities

## [Facility maintenance shutdown](https://ganttfather.com/templates/facility-maintenance-shutdown/)

 Best for coordinating one bounded facility shutdown, maintenance-readiness, and return-to-service planning cycle without safety, inspection, code, regulatory, compliance, or approval guidance.

 7 tasks 8 links 13 working days

 [Use this template](https://ganttfather.com/templates/facility-maintenance-shutdown/)

 Real estate & facilities

## [Property acquisition planning](https://ganttfather.com/templates/property-acquisition/)

 Best for coordinating one defined property-acquisition planning boundary through owner-provided diligence inputs, reviews, decisions, and handoff without legal, investment, financing, or approval guidance.

 7 tasks 8 links 15 working days

 [Use this template](https://ganttfather.com/templates/property-acquisition/)

 Real estate & facilities

## [Property renovation coordination](https://ganttfather.com/templates/property-renovation/)

 Best for coordinating one defined property-renovation planning boundary through organization-owned work-package, review, and return-to-use preparation without code, safety, inspection, regulatory, or approval guidance.

 7 tasks 8 links 16 working days

 [Use this template](https://ganttfather.com/templates/property-renovation/)

 Real estate & facilities

## [Real estate development](https://ganttfather.com/templates/real-estate-development/)

 Best for coordinating one defined property-development planning boundary through organization-owned concept, delivery, review, and handoff inputs without legal, investment, code, safety, or approval guidance.

 7 tasks 8 links 18 working days

 [Use this template](https://ganttfather.com/templates/real-estate-development/)

 Real estate & facilities

## [Retail store opening](https://ganttfather.com/templates/retail-store-opening/)

 Best for coordinating one defined retail-location opening planning boundary through organization-owned readiness, review, and handoff inputs without legal, safety, code, inspection, regulatory, or approval guidance.

 7 tasks 8 links 16 working days

 [Use this template](https://ganttfather.com/templates/retail-store-opening/)

 Creative & media

## [Book writing](https://ganttfather.com/templates/book-writing/)

 Best for completing one book manuscript from concept and outline through drafting, editorial review, and a review-ready handoff.

 8 tasks 8 links 32 working days

 [Use this template](https://ganttfather.com/templates/book-writing/)

 Creative & media

## [Editorial calendar](https://ganttfather.com/templates/editorial-calendar/)

 Best for planning and completing one bounded editorial period from content goals through published work, review, and a documented close milestone.

 8 tasks 8 links 25 working days

 [Use this template](https://ganttfather.com/templates/editorial-calendar/)

 Creative & media

## [Film production](https://ganttfather.com/templates/film-production/)

 Best for producing one film or bounded video work from a production brief through delivery of an approved final master.

 8 tasks 8 links 27 working days

 [Use this template](https://ganttfather.com/templates/film-production/)

 Creative & media

## [Podcast launch](https://ganttfather.com/templates/podcast-launch/)

 Best for launching one podcast series from show concept through pilot production, initial release, and a launch retrospective.

 9 tasks 9 links 20 working days

 [Use this template](https://ganttfather.com/templates/podcast-launch/)

 Creative & media

## [YouTube channel launch](https://ganttfather.com/templates/youtube-channel-launch/)

 Best for launching one YouTube channel from approved concept through initial videos, publication, and a first release review.

 8 tasks 8 links 22 working days

 [Use this template](https://ganttfather.com/templates/youtube-channel-launch/)

 Personal & career

## [Certification study](https://ganttfather.com/templates/certification-study/)

 Best for coordinating one finite certification study project with visible decisions, owners, and completion checkpoints.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/certification-study/)

 Personal & career

## [Home move](https://ganttfather.com/templates/home-move/)

 Best for coordinating one finite home move project with visible decisions, owners, and completion checkpoints.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/home-move/)

 Personal & career

## [Job search](https://ganttfather.com/templates/job-search/)

 Best for coordinating one finite job search project with visible decisions, owners, and completion checkpoints.

 7 tasks 7 links 18 working days

 [Use this template](https://ganttfather.com/templates/job-search/)

 Personal & career

## [Portfolio website](https://ganttfather.com/templates/portfolio-website/)

 Best for coordinating one finite portfolio website project with visible decisions, owners, and completion checkpoints.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/portfolio-website/)

 Personal & career

## [Vacation planning](https://ganttfather.com/templates/vacation-planning/)

 Best for coordinating one finite vacation planning project with visible decisions, owners, and completion checkpoints.

 7 tasks 7 links 17 working days

 [Use this template](https://ganttfather.com/templates/vacation-planning/)

 How templates work

## A copy, not a contract.

- 1

### Pick one and it copies into your account

 The template becomes an ordinary project you own — tasks, dependencies, durations, and hierarchy are editable from the first second.

- 2

### Set one date, the rest follow

 Durations and links are already in place, so moving the project start gives your team a schedule ready for its real dates.

- 3

### Nothing is locked afterwards

 Rename, delete, re-nest, and change statuses. There is no template mode to exit and no hidden structure left behind.

 ![](https://ganttfather.com/logo.png) GanttFather

 Nothing to configure first

 Every template is free, on every plan. Your first project is on the house.

 [Start for free](https://app.ganttfather.com/login)