# Design system rollout

[Product & design](https://ganttfather.com/templates/#product-design) Project timeline template

# Design system rollout

 Best for coordinating a bounded Design system rollout project from Audit interface inventory through Migrate target surfaces.

 Best for introducing an approved design system to a defined product scope through adoption and migration checkpoints.

 [Use the Design system rollout template free](https://app.ganttfather.com/projects/new?template=design-system-rollout&entry=template-library)

 Put Audit interface inventory, Build core components, and Migrate target surfaces on one agreed path.

## Design system rollout: make the handoff from Audit interface inventory to Migrate target surfaces visible.

 The Design system rollout template turns a finite product-design outcome into a visible path through Baseline, Foundation, and Adoption. It gives a multidisciplinary team a shared sequence rather than a collection of disconnected workshops or tickets.

 The schedule connects Audit interface inventory, Build core components, and Migrate target surfaces. Milestones such as Rollout scope approved, Pilot adoption verified, and Design system rollout complete make the evidence or approval required for the next handoff easy to find.

 After creating the project, replace relative days with real dates, assign accountable owners, and add internal details only where they belong. The public starter deliberately excludes Design tool credentials and Production code access.

 Included schedule

## 11 rows, 5 links, already sequenced.

 Explore the Design system rollout schedule to connect Audit interface inventory, Build core components, and Migrate target surfaces.

 Read-only preview Milestone

 Week 1

 Week 2

 Week 3

 Week 4

 Week 5

 1 Day

 2 Day

 3 Day

 4 Day

 5 Day

 6 Day

 7 Day

 8 Day

 9 Day

 10 Day

 11 Day

 12 Day

 13 Day

 14 Day

 15 Day

 16 Day

 17 Day

 18 Day

 19 Day

 20 Day

 21 Day

 22 Day

 23 Day

 24 Day

 Audit interface inventory

 Set adoption scope

 Build core components

 Document usage patterns

 Migrate target surfaces

 Relative days show the order for Design system rollout; set one real start date after creation.

 Read-only shared Gantt preview. Focus a bar and press Enter to inspect it.

 Schedule details

### Complete schedule table

 Put Audit interface inventory, Build core components, and Migrate target surfaces on one agreed path.

 Work item Type Schedule Duration Depends on

 Baseline Phase Days 1–7 Derived rollup —

 Audit interface inventory Task Days 1–3 3 working days —

 Set adoption scope Task Days 4–6 3 working days Audit interface inventory

 Rollout scope approved Milestone Day 7 Milestone Set adoption scope

 Foundation Phase Days 8–18 Derived rollup —

 Build core components Task Days 8–13 6 working days —

 Document usage patterns Task Days 14–17 4 working days Build core components

 Pilot adoption verified Milestone Day 18 Milestone Document usage patterns

 Adoption Phase Days 19–24 Derived rollup —

 Migrate target surfaces Task Days 19–23 5 working days —

 Design system rollout complete Milestone Day 24 Milestone Migrate target surfaces

## Who it helps

- Product managers and design leads responsible for Design system rollout
- Researchers, designers, and delivery partners aligning the Migrate target surfaces decision

## What is included

- Baseline: Audit interface inventory, Set adoption scope, and Rollout scope approved
- Foundation: Build core components, Document usage patterns, and Pilot adoption verified
- Adoption: Migrate target surfaces and Design system rollout complete

## Adapt after creation

- Add secured information represented by Design tool credentials and Production code access.
- Replace relative working days with the real project start date.
- Assign one accountable owner to each handoff and approval.

 How to use this template

## Design system rollout: make the handoff from Audit interface inventory to Migrate target surfaces visible.

- 1

### Baseline

 Start with Audit interface inventory and Set adoption scope so the opening handoff is explicit.

- 2

### Foundation

 Use Build core components and Document usage patterns to turn progress into a concrete approval.

- 3

### Adoption

 Finish with Migrate target surfaces and record Design system rollout complete for the next accountable team.

 Not included

## Planning aid

 This public planning aid contains no confidential research, contract, or production material. Add Design tool credentials and Production code access only inside your secured project.

- Design tool credentials
- Production code access

 Template FAQ

## Good to know

 What does the Design system rollout template include? + It sequences Baseline, Foundation, and Adoption around named work such as Audit interface inventory, Build core components, and Migrate target surfaces.

 Who should use this Design system rollout plan? + It supports teams that need a finite delivery boundary and an explicit decision after Migrate target surfaces.

 How should I adapt the schedule? + Set dates and owners after creation, then add protected details such as Design tool credentials and Production code access.

 Related templates

## Related templates

 [Templates →](https://ganttfather.com/templates/)

 [Product & design 22 working days New product development Best for coordinating a bounded New product development project from Define product scope through Prepare launch handoff.](https://ganttfather.com/templates/new-product-development/)[Product & design 20 working days Brand identity design Best for coordinating a bounded Brand identity design project from Align brand brief through Package brand guidelines.](https://ganttfather.com/templates/brand-identity-design/)

 ![](https://ganttfather.com/logo.png)

## Use the Design system rollout template free

 Keep scope, evidence, and ownership connected before the work moves forward.

 [Use the Design system rollout template free](https://app.ganttfather.com/projects/new?template=design-system-rollout&entry=template-library) Put Audit interface inventory, Build core components, and Migrate target surfaces on one agreed path.