---
title: "How to Get the Student Benefit, Step by Step | GanttFather"
description: "Sign in with your school email and activate it in Settings: 1 extra project, with its 2 editors, until your term ends, 6 months at most."
canonical: "https://ganttfather.com/student-benefit-how-to/"
locale: "en"
category: "for"
---

# How to Get the Student Benefit, Step by Step | GanttFather

[Home](https://ganttfather.com/) › [Free Gantt chart for students](https://ganttfather.com/free-gantt-for-students/) › How to get the student benefit

 **Student benefit · step by step

# How to get the student benefit

 Sign in with your school email, open Settings › Student benefit, choose the month your term ends and click Activate. At a university in the programme, this adds 1 extra project, with its 2 editors, until your term ends, 6 months at most.

 [Check your university](https://ganttfather.com/free-gantt-for-students/) [Open Student benefit](https://app.ganttfather.com/settings/student)

 Time About 3 minutes

 You need An account that signs in with your school email

 You get 1 extra project, with its 2 editors

 How long Until your term ends, 6 months at most

 Five steps

## Step by step

 What you see in the app at each step.

- 1

### Check that your university is in the programme

 Type its name in the search box on the [students page](https://ganttfather.com/free-gantt-for-students/). It answers one of three things: in the programme, not in the programme yet, or not found.

 Not in the programme yet? See what to do further down this page.

 The search box is at the top of the students page.

 [Check your university](https://ganttfather.com/free-gantt-for-students/)

- 2

### Sign in with your school email

 The benefit works only with the email you sign in with. At [app.ganttfather.com](https://app.ganttfather.com/login), choose **Sign in with Google** with your school account, or sign up with your school email and a password. Sign-in with GitHub does not unlock the benefit. No card.

 Does your school use Microsoft 365 or Outlook? Sign up with your school email and a password. Sign-in with Microsoft is not available.
- Signed up with a password? Confirm your email from the message we send.
- Already have an account with a personal email? An account’s email cannot be changed, so create a new account with your school email. You can share or hand over your projects to it.

 Free forever, no card.

 [Create a free account](https://app.ganttfather.com/login)

- 3

### Open Settings › Student benefit

 Click your name at the bottom of the sidebar, choose **Settings**, then **Student benefit** in the list on the left. You see **Activate your student benefit**, your account email and that your university is in the programme.

 Student benefit appears only when your account’s email is at a university in the programme.

 ![GanttFather Settings with Student benefit selected in the list. The page shows Activate your student benefit, the account email, a line saying the university is in the programme, a Term ends menu and an Activate button.](https://ganttfather.com/guides/student-benefit-how-to/en/offer.webp) Settings › Student benefit, before you activate.
- 4

### Choose the month your term ends, then Activate

 Under **Term ends**, choose the month your current term or semester ends. Then click **Activate**.

 The benefit ends at the end of that month, or 6 months after you activate it, whichever comes first.

 ![The Student benefit page with April 2027 chosen as the month the term ends, next to the Activate button.](https://ganttfather.com/guides/student-benefit-how-to/en/filled.webp) The month your term ends, chosen.
- 5

### Your student benefit is active

 Settings shows **Your student benefit is active**, **+1 project**, your university and the day it ends. Create your extra project the usual way. It comes with its 2 editors.

 ![Student benefit in Settings saying Your student benefit is active, verified with the school domain, +1 project, the end date, and what happens when it ends.](https://ganttfather.com/guides/student-benefit-how-to/en/active.webp) The benefit is active, with its end date.

 The end

## What happens when it ends

 The benefit does not renew. Nothing is deleted.

 Your free project and its 2 editors stay, free forever

 Extra project, with its 2 editors

 Read-only. Nothing is deleted.

 You activate the benefit

 Your term ends, 6 months at most

 When it ends, the extra project becomes read-only and editors who no longer fit become viewers, so everyone can still open the plan. We remind you before the end date.

 Group work

## Add your classmates

 Open the project, go to the **Team** tab and click **Invite user**. Enter their email and choose a role.

### Editor

 Can create and edit tasks. Each project has 2 editors included. Editing a project a classmate owns is free for you.

### Viewer

 Can open the Gantt chart and the tasks without changing them. Viewers are free and unlimited.

 If something is different

## What the app may show instead

 Each case, and what to do about it.

### Verify the email you sign in with first, then come back here

 Your email is at a university in the programme, but it is not confirmed yet. Click **Open Account**, confirm your email from the message we send, then come back to **Student benefit**.

 ![Student benefit in Settings saying Verify the email you sign in with first, then come back here, with an Open Account button.](https://ganttfather.com/guides/student-benefit-how-to/en/unverified.webp) The account email is not confirmed yet.

### We are checking your school

 Sometimes a person checks a school before the benefit starts, for example when many students from one school activate it on the same day. You do not need to do anything. The benefit starts when they release it, and the app tells you.

 ![Student benefit in Settings saying We are checking your school: a person is checking the school and the benefit starts when they release it.](https://ganttfather.com/guides/student-benefit-how-to/en/held.webp) A person is checking the school.

### You do not see Student benefit in Settings

 Your account signs in with an email that is not at a university in the programme. Sign in with your school email instead. If your university is not in the programme yet, write to support@ganttfather.com with its name and website and, if you can, the contact of a representative: head of department, head of programme or a director. The list grows when universities ask.

### This email has already been used for the student benefit

 One school address gets the benefit once. If you think this is a mistake, write to support@ganttfather.com.

## Frequently asked questions

 Something else? Write to support@ganttfather.com

### Does the student benefit cost anything?

 No. The student benefit is free, and so is the free plan: 1 project you own, 2 editors and unlimited free viewers. Neither needs a card.

### How long does the student benefit last?

 Until the end of the month you choose as the end of your term, and at most 6 months from the day you activate it. It does not renew.

### Which email does the benefit use?

 The email you sign in with. The benefit applies only to your account’s own email, so your account must sign in with your address at the university.

### Can I get the benefit on an account with a personal email?

 No. An account’s email cannot be changed, so create a new account with your school email. You can share your projects with it or hand them over to it.

### My university uses Microsoft 365. How do I sign in?

 Sign up with your school email and a password, then confirm your email from the message we send. Sign-in with Microsoft is not available.

### Can two accounts use the same school address?

 No. One school address gets the benefit once.

### What happens to my project when the benefit ends?

 Nothing is deleted. The extra project becomes read-only, and editors who no longer fit become viewers. Your free project and its 2 editors are not affected.

## Ready? It takes a few minutes

 Sign in with your school email, then open Settings › Student benefit.

 [Open Student benefit](https://app.ganttfather.com/settings/student) [Check your university](https://ganttfather.com/free-gantt-for-students/)

 Updated November 9, 2026
