---
title: "Apa yang baru · v0.16.3 · GanttFather"
description: "Apa yang baru v0.16.3: Flexible Azure DevOps imports. Dirilis pada 17 Juli 2026."
canonical: "https://ganttfather.com/id/releases/2026-07-17-v0.16.3/"
locale: "id"
category: "history"
---

# Apa yang baru · v0.16.3 · GanttFather

[← Kembali ke Apa yang baru](https://ganttfather.com/id/releases/)
v0.16.3 Dirilis pada 17 Juli 2026

# Flexible Azure DevOps imports

 Copy as Markdown | [View as Markdown](https://ganttfather.com/id/releases/2026-07-17-v0.16.3/index.md)

## Improved

- **Azure fields can now be mapped per work item type.** Choose the Start, End, and Estimation fields that each Azure DevOps work item uses, including custom process fields.

- **Imports can be limited to the work item types you need.** Select which types to bring into the Gantt while keeping their individual field mappings.

- **Existing integrations are easier to manage.** Configure a source’s mappings, save and re-sync it, add more sources, or remove a source or the complete connection from one clearer settings view.

- **The importer is available in every app language.** Connection, setup, source management, mapping, validation, and synchronization copy is covered across all 10 supported UI languages.

## Bug Fixes

- **Mapped estimates now sync into Gantt Estimation.** Story Points, Effort, Size, Original Estimate, and compatible custom numeric fields are applied during initial import and re-sync.

- **Mapped dates and estimates remain source-specific.** Updating one query or board re-syncs only that source without changing unrelated source configurations.

## Try GanttFather free

 Every feature included — Gantt, Kanban, dependencies, critical path, real-time sync, Excel, AI agents. Free tier includes 1 project you own, 2 editor seats, and unlimited viewers and guests.

 [Start free](https://app.ganttfather.com/login) [Lihat harga](https://ganttfather.com/id/pricing/)
