---
title: "Quoi de neuf | GanttFather"
description: "Nouvelles fonctionnalités, améliorations et corrections livrées sur GanttFather, version par version."
canonical: "https://ganttfather.com/fr/releases/"
locale: "fr"
category: "history"
---

# Quoi de neuf | GanttFather

# Quoi de neuf

 Nouvelles fonctionnalités et corrections dans GanttFather.

 Mis à jour le 24 juillet 2026

 Besoin d'aide ?

 Contactez-nous — nous serons ravis de vous aider.

 support@ganttfather.com

 [v0.17.2 Dernière 24 juillet 2026 Faster, smoother reports Reports and dashboards load faster, especially for larger projects. Keep working while reports are prepared. You will be notified when your file is ready to… Lire plus →](https://ganttfather.com/fr/releases/2026-07-24-v0.17.2/)

## juillet 2026

- [v0.17.1 22 juillet 2026 Reliability fixes Project creation works consistently. Available project spaces now appear correctly in the sidebar. Projects are easier to find. Sidebar projects now appear i… Lire plus →](https://ganttfather.com/fr/releases/2026-07-22-v0.17.1/)
- [v0.17.0 21 juillet 2026 Reports & dashboards Introducing Reports & dashboards. Explore project health, progress, workload, risks, trends, and task details in a dedicated reporting workspace. Create the… Lire plus →](https://ganttfather.com/fr/releases/2026-07-21-v0.17.0/)
- [v0.16.5 20 juillet 2026 Azure DevOps force updates Confirm updates that need review. Select individual tasks or all visible tasks to publish the reviewed GanttFather values to Azure DevOps. Date updates prese… Lire plus →](https://ganttfather.com/fr/releases/2026-07-20-v0.16.5/)
- [v0.16.4 19 juillet 2026 Two-way Azure DevOps sync Review and publish changes to Azure DevOps. See the exact dates and estimates that will change, leave out any work item you do not want to update, and confir… Lire plus →](https://ganttfather.com/fr/releases/2026-07-19-v0.16.4/)
- [v0.16.3 17 juillet 2026 Flexible Azure DevOps imports Azure fields can now be mapped per work item type. Choose the Start, End, and Estimation fields that each Azure DevOps work item uses, including custom proce… Lire plus →](https://ganttfather.com/fr/releases/2026-07-17-v0.16.3/)
- [v0.16.2 9 juillet 2026 Multiple task assignees Tasks can now have multiple assignees. Assign people, agents, and resources together without replacing the existing owner. Task details show the full assignm… Lire plus →](https://ganttfather.com/fr/releases/2026-07-09-v0.16.2/)
- [v0.16.1 7 juillet 2026 Spectator and metrics polish Shared links now follow your canvas theme. Spectator views use the same White, Bone, or Dark canvas as the main Gantt chart, so public read only schedules no… Lire plus →](https://ganttfather.com/fr/releases/2026-07-07-v0.16.1/)
- [v0.16.0 6 juillet 2026 Weekly status emails Weekly project status emails. Each project can send a once a week email — overall progress and how much it moved this week, what's overdue, and what's due ne… Lire plus →](https://ganttfather.com/fr/releases/2026-07-06-v0.16.0/)
- [v0.15.0 5 juillet 2026 The GanttFather API Build on GanttFather with the new REST API. Everything you do in the app — create tasks, update status and dates, manage dependencies and resources — you can… Lire plus →](https://ganttfather.com/fr/releases/2026-07-05-v0.15.0/)
- [v0.14.0 2 juillet 2026 The task panel, redesigned Adaptive compact panel. Narrow the panel and Status becomes a glanceable shape (○ open, ◐ in progress, ✓ done) and Assigned a single avatar — task names keep… Lire plus →](https://ganttfather.com/fr/releases/2026-07-02-v0.14.0/)
- [v0.13.0 1 juillet 2026 GanttFather speaks 10 languages Five new languages. GanttFather is now available in Deutsch, 日本語, 한국어, Bahasa Indonesia, and हिन्दी — alongside English, Español, Français, Português, and It… Lire plus →](https://ganttfather.com/fr/releases/2026-07-01-v0.13.0/)
- [v0.12.1 1 juillet 2026 Your AI agents are now teammates you can see AI agents show up as real teammates. When an AI assistant works in your project through a connector, it now appears with its own name and a friendly avatar —… Lire plus →](https://ganttfather.com/fr/releases/2026-07-01-v0.12.1/)

## juin 2026

- [v0.11.1 30 juin 2026 Task descriptions feel smoother — and your board is quieter Click anywhere to start writing. The whole description area is now active — click anywhere in the box and your cursor lands there, ready to type. No more aim… Lire plus →](https://ganttfather.com/fr/releases/2026-06-30-v0.11.1/)
- [v0.11.0 29 juin 2026 Rich task descriptions — write real docs, right inside your tasks A real editor, not a plain text box. Task descriptions now format as you type — headings, bold , italic , strikethrough, bulleted and numbered lists, quotes,… Lire plus →](https://ganttfather.com/fr/releases/2026-06-29-v0.11.0/)
- [v0.10.0 28 juin 2026 Simpler, more predictable pricing — built around projects and editors Free to start, free to stay. Create a project for free, with you plus 2 editor seats included at no cost. Viewers and guests are always free and unlimited —… Lire plus →](https://ganttfather.com/fr/releases/2026-06-28-v0.10.0/)
- [v0.9.1 26 juin 2026 AI assistants can now manage dependencies and keep your plan current Your AI assistant can now manage task dependencies. A connected AI assistant can add, change and remove the links between tasks — and it follows the same rul… Lire plus →](https://ganttfather.com/fr/releases/2026-06-26-v0.9.1/)
- [v0.9.0 24 juin 2026 Host teammates on your slots Host a teammate on your slot. When you invite someone to edit a project you own, your slot now covers them — so they can start editing right away without spe… Lire plus →](https://ganttfather.com/fr/releases/2026-06-24-v0.9.0/)
- [v0.8.1 23 juin 2026 Italiano is here — and invitations now speak your language Italian joins the lineup. Pick "Italiano" from the language switcher and the whole app — menus, task fields, tooltips, onboarding, billing, project health an… Lire plus →](https://ganttfather.com/fr/releases/2026-06-23-v0.8.1/)
- [v0.8.0 18 juin 2026 The Agent Release — plan with AI, across every project GanttFather now works hand‑in‑hand with AI assistants — Claude, ChatGPT, Cursor, and other AI tools you may already use. Connect once and your assistant can… Lire plus →](https://ganttfather.com/fr/releases/2026-06-18-v0.8.0/)
- [v0.7.0 11 juin 2026 Custom Task Statuses, the New Excel Import/Export & Smarter Collaboration Limits Custom Task Statuses — Your workflow, your words. Manage everything from Settings → Task statuses. Define your own statuses: rename "In Progress" to "In Deve… Lire plus →](https://ganttfather.com/fr/releases/2026-06-11-v0.7.0/)
- [v0.6.0 9 juin 2026 Project Archives & Unified Settings Cold Storage for Deleted Projects : Deleting a project no longer destroys it instantly. Instead, it is safely moved to a read only "Archived" state for 30 da… Lire plus →](https://ganttfather.com/fr/releases/2026-06-09-v0.6.0/)
- [v0.5.2 8 juin 2026 End dates now display inclusively across all views End dates are now intuitive. The Gantt chart bars, date pickers, Kanban boards, and List views now accurately display the final working day of a task instead… Lire plus →](https://ganttfather.com/fr/releases/2026-06-08-v0.5.2/)
- [v0.5.1 6 juin 2026 Accurate working days, durations, and weekend shading in every time zone Working day counts are correct in every time zone. Tasks that span a weekend or non working day now show the right number of working days, wherever you are.… Lire plus →](https://ganttfather.com/fr/releases/2026-06-06-v0.5.1/)
- [v0.5.0 2 juin 2026 Project versioning — save, preview, and restore snapshots of your entire project Capture, browse, and restore complete project snapshots. Every task, dependency, and assignment is saved — not just what changed, but the full state at that… Lire plus →](https://ganttfather.com/fr/releases/2026-06-02-v0.5.0/)

## mai 2026

- [v0.4.0 27 mai 2026 Automatic dependency scheduling Tasks now move automatically when their predecessors change. Creating a Finish to Start dependency or dragging a predecessor forward will push successor task… Lire plus →](https://ganttfather.com/fr/releases/2026-05-27-v0.4.0/)
- [v0.3.2 19 mai 2026 AI agent setup fix, authorization hardening, and crash recovery Fixed AI agent connection failures caused by mismatched config snippets. The configuration blocks in Settings → MCP & AI Agents now show the correct JSON str… Lire plus →](https://ganttfather.com/fr/releases/2026-05-19-v0.3.2/)
- [v0.3.1 12 mai 2026 Calendar consistency and UI bug fixes Consistent duration display in Kanban Board. Task cards on the Kanban board now calculate and display the duration accounting for working days vs calendar da… Lire plus →](https://ganttfather.com/fr/releases/2026-05-12-v0.3.1/)
- [v0.3.0 11 mai 2026 Team Calendar, working schedules, and smart duration tracking Configure which days of the week your team works. Open the Team tab to select working days — no longer limited to Monday through Friday. Three day weeks, wee… Lire plus →](https://ganttfather.com/fr/releases/2026-05-11-v0.3.0/)
- [v0.2.6 7 mai 2026 Inline task creation from the Gantt list, plus a smoother onboarding tour Hover over a task group to reveal an "Add subtask" button. When your mouse is over a parent task and its children, a "+" row appears at the end of the group… Lire plus →](https://ganttfather.com/fr/releases/2026-05-07-v0.2.6/)
- [v0.2.5 4 mai 2026 Smoother Gantt table resizing, polished sidebar, and a refreshed look Resize the task panel from anywhere along its edge. The right border of the task list is now draggable in both the header and the body, not just below the co… Lire plus →](https://ganttfather.com/fr/releases/2026-05-04-v0.2.5/)
- [v0.2.4 1 mai 2026 Project preferences, safer task colors, and sturdier team details Project preferences are now easier to find. Project Settings starts with display preferences, and the new section index lets you jump straight to Preferences… Lire plus →](https://ganttfather.com/fr/releases/2026-05-01-v0.2.4/)

## avril 2026

- [v0.2.3 24 avril 2026 Pick your canvas: themes, dark mode and a calmer app Theme picker in Preferences. Settings → Appearance is now Preferences and ships with a theme selector: White for a crisp background, Bone (default) for the n… Lire plus →](https://ganttfather.com/fr/releases/2026-04-24-v0.2.3/)
- [v0.2.0 22 avril 2026 Slot-based plans, referral bonuses and a refreshed Settings experience Minimalist UI/UX across Settings. Profile, Project Settings, Billing, Privacy and Release Notes now share one quiet layout — cleaner sidebar, restrained typo… Lire plus →](https://ganttfather.com/fr/releases/2026-04-22-v0.2.0/)
- [v0.1.5 20 avril 2026 Scrollable profile, section shortcuts, and a cleaner Metrics diagnostic panel Section shortcuts in Profile and Project Settings. A floating index on the right lets you jump straight to Personal Information, Email, Account Details, Sign… Lire plus →](https://ganttfather.com/fr/releases/2026-04-20-v0.1.5/)
- [v0.1.2 18 avril 2026 Clearer consent for our legal terms, plus access fixes Terms, Privacy and Cookies consent is now tracked. When you sign up, your acceptance is recorded along with the version you agreed to. If we later publish ma… Lire plus →](https://ganttfather.com/fr/releases/2026-04-18-v0.1.2/)
- [v0.1.1 17 avril 2026 Release notes, ownership transfer fix, and clearer errors Release notes in the app. Catch up on what's new in GanttFather without leaving the app. Each version is grouped by month, and a floating index on the right… Lire plus →](https://ganttfather.com/fr/releases/2026-04-17-v0.1.1/)
- [v0.1.0 16 avril 2026 Smarter assignment, drag-and-drop fixes, and Critical Path Assignee picker now lists people alphabetically. New Critical Path view that computes the longest dependency chain per task group. Added a tooltip on the Cri… Lire plus →](https://ganttfather.com/fr/releases/2026-04-16-v0.1.0/)
- [v0.0.12 9 avril 2026 Share pages speak your language Public share (spectator) pages now include a language switcher — stakeholders can read your plan in English, Spanish or French without signing in. Dates on p… Lire plus →](https://ganttfather.com/fr/releases/2026-04-09-v0.0.12/)
- [v0.0.11 8 avril 2026 Dependencies you can draw and tighter hover controls Full dependency management directly on the Gantt — create, edit and remove links between tasks with visual connectors instead of opening a form. Hover contro… Lire plus →](https://ganttfather.com/fr/releases/2026-04-08-v0.0.11/)
- [v0.0.10 7 avril 2026 Reliable reordering and a visible sync status New sync status bar tells you at a glance whether changes are queued, syncing or safely saved. Edits keep going when your connection drops — pending changes… Lire plus →](https://ganttfather.com/fr/releases/2026-04-07-v0.0.10/)

## mars 2026

- [v0.0.9 12 mars 2026 Real-time collaboration and offline resilience See who else is viewing a project in real time with live presence avatars. Work offline without losing changes — pending edits sync automatically when you re… Lire plus →](https://ganttfather.com/fr/releases/2026-03-12-v0.0.9/)

 Besoin d'aide ?

 Contactez-nous — nous serons ravis de vous aider.

 support@ganttfather.com
