---
title: "Quoi de neuf · v0.28.1 · GanttFather"
description: "Quoi de neuf v0.28.1: More precise live cursors. Publiée le 9 septembre 2026."
canonical: "https://ganttfather.com/fr/releases/2026-09-09-v0.28.1/"
locale: "fr"
category: "history"
---

# Quoi de neuf · v0.28.1 · GanttFather

v0.28.1 9 septembre 2026

# More precise live cursors

 Stay attached to the right content. Live cursors stay tied to the right task, date, or field as collaborators use different panel widths, scroll positions, sidebar states, and Gantt time modes. Keep stationary pointers current. Cursor positions refresh after scrolling or resizing even when the mouse stays still, so the shared…

Share
 [Subscribe to releases](https://ganttfather.com/releases/feed.xml)

 ![GanttFather release v0.28.1](https://ganttfather.com/landing/app-gantt.png) The GanttFather workspace after this release, with dependencies and the critical path visible.

## Improved

- **Stay attached to the right content.** Live cursors stay tied to the right task, date, or field as collaborators use different panel widths, scroll positions, sidebar states, and Gantt time modes.

- **Keep stationary pointers current.** Cursor positions refresh after scrolling or resizing even when the mouse stays still, so the shared pointer reflects what is now under that pointer.

- **Move smoothly between nearby content.** When a collaborator moves between different panes or content, the cursor makes a short transition instead of sweeping through unrelated areas.

- **Make pointers and names easier to read.** Sharper pointers, profile photos or initials, and readable labels stay clear near panel edges and in tight spaces.

## Bug Fixes

- **Handle unavailable locations calmly.** When a shared location is not available in your view, presence shows a neutral unavailable indicator instead of pointing at unrelated content.

- **Keep the latest position.** Live cursors settle on the most recent confirmed location when a target is still being checked, so an older position does not reappear.

## Recent releases

 [v0.28.2 Steadier live cursors in task tables](https://ganttfather.com/fr/releases/2026-09-09-v0.28.2/)[v0.28.0 Live cursors and clearer invitations](https://ganttfather.com/fr/releases/2026-09-08-v0.28.0/)[v0.27.0 Clearer Azure DevOps reviews](https://ganttfather.com/fr/releases/2026-08-30-v0.27.0/)[v0.26.1 A smoother workspace](https://ganttfather.com/fr/releases/2026-08-29-v0.26.1/)

 Besoin d'aide ?

 Contactez-nous — nous serons ravis de vous aider.

 support@ganttfather.com
