---
title: "Quoi de neuf · v0.25.1 · GanttFather"
description: "Quoi de neuf v0.25.1: A steadier Azure DevOps experience. Publiée le 27 août 2026."
canonical: "https://ganttfather.com/fr/releases/2026-08-27-v0.25.1/"
locale: "fr"
category: "history"
---

# Quoi de neuf · v0.25.1 · GanttFather

v0.25.1 27 août 2026

# A steadier Azure DevOps experience

 One guided Configure fields flow. Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in. Steadier sync progress. While Azure DevOps work is importing, GanttFather checks progress without repeatedly refreshing the connection or…

Share
 [Subscribe to releases](https://ganttfather.com/releases/feed.xml)

 ![GanttFather release v0.25.1](https://ganttfather.com/landing/app-gantt.png) The GanttFather workspace after this release, with dependencies and the critical path visible.

## Improved

- **One guided Configure fields flow.** Existing Azure sources now open in the same guided setup used when adding a source, beginning at Dates & effort with your saved choices already filled in.

- **Steadier sync progress.** While Azure DevOps work is importing, GanttFather checks progress without repeatedly refreshing the connection or sending extra requests.

- **A smoother recovery after reconnecting.** When you update Azure DevOps access, source details refresh so you can continue setup without starting over.

- **A calmer integrations screen.** Parent authority controls stay aligned, explain when only the project owner can change them, and source-menu actions use the full clickable row.

## Bug Fixes

- **Interrupted syncs no longer stay stuck.** If an import is interrupted by a restart or connection problem, it is safely made ready to retry.

- **Closing or retrying setup is safe.** You can close a pending setup or try again without leaving the page spinning; brief connection hiccups get a chance to recover.

## Recent releases

 [v0.28.2 Steadier live cursors in task tables](https://ganttfather.com/fr/releases/2026-09-09-v0.28.2/)[v0.28.1 More precise live cursors](https://ganttfather.com/fr/releases/2026-09-09-v0.28.1/)[v0.28.0 Live cursors and clearer invitations](https://ganttfather.com/fr/releases/2026-09-08-v0.28.0/)[v0.27.0 Clearer Azure DevOps reviews](https://ganttfather.com/fr/releases/2026-08-30-v0.27.0/)

 Besoin d'aide ?

 Contactez-nous — nous serons ravis de vous aider.

 support@ganttfather.com
