---
title: "Quoi de neuf · v0.16.2 · GanttFather"
description: "Quoi de neuf v0.16.2: Multiple task assignees. Publiée le 9 juillet 2026."
canonical: "https://ganttfather.com/fr/releases/2026-07-09-v0.16.2/"
locale: "fr"
category: "history"
---

# Quoi de neuf · v0.16.2 · GanttFather

[← Retour à Quoi de neuf](https://ganttfather.com/fr/releases/)
v0.16.2 Publiée le 9 juillet 2026

# Multiple task assignees

 Copy as Markdown | [View as Markdown](https://ganttfather.com/fr/releases/2026-07-09-v0.16.2/index.md)

## Improved

- **Tasks can now have multiple assignees.** Assign people, agents, and resources together without replacing the existing owner.

- **Task details show the full assignment list.** The detail panel now lists every assigned person, agent, and resource instead of hiding extras behind a count.

- **Task details now show creation context.** Fullscreen task details include the task creation date and creator avatar when that audit data is available.

- **Assignees are clearer across every view.** Gantt, List, and Board keep stacked avatars with overflow counts and full hover labels, and parent Gantt bars now show their assignees at the end of the bar.

## Bug Fixes

- **Old assignee references no longer block updates.** If a task still has a stale assignment ID, saving the assignee picker filters it out instead of preventing valid changes.

- **Gantt date resizing stays recoverable.** Dragging a task’s end before its start now clamps to the smallest usable duration — one hour in Hours view, one day in the other timeline views — so the task never collapses into an uneditable sliver.

## Essayez GanttFather gratuitement

 Chaque fonctionnalité incluse — Gantt, Kanban, dépendances, chemin critique, sync temps réel, Excel, agents IA. L'offre gratuite inclut 1 projet que vous possédez, 2 sièges éditeur et des lecteurs et invités illimités.

 [Commencer gratuitement](https://app.ganttfather.com/login) [Voir les tarifs](https://ganttfather.com/fr/pricing/)
