# What Is GanttFather? Features, Free Limits, and Pricing | GanttFather Blog

# What Is GanttFather? Features, Free Limits, and Pricing

 Get a current, evidence-based overview of GanttFather: Gantt and Kanban planning, dependencies, critical path, collaboration, API and MCP access, pricing, and limits.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated August 30, 2026 9 min read

 Tags

 ganttfather gantt-charts project-management free-tools

 The short answer

 Get a current, evidence-based overview of GanttFather: Gantt and Kanban planning, dependencies, critical path, collaboration, API and MCP access, pricing, and limits.

 GanttFather is a browser-based Gantt and Kanban project-planning tool. Its current free tier covers **one project you own, two active editors on that project, and unlimited viewers and guests**. Core planning capabilities include interactive scheduling, four dependency types with lag, critical-path analysis, resources, Excel import/export, real-time collaboration, a REST API, and AI-agent access through MCP.

 **Product and competitor details verified August 7, 2026.** Pricing changes, so confirm a purchasing decision on each vendor’s live pricing page.

## What problem does GanttFather solve?

 GanttFather is designed for teams that need a real dependency-based schedule without adopting a large enterprise portfolio suite. The same tasks can be viewed on an interactive Gantt chart, Kanban board, and supporting project views, so a delivery lead can inspect dates while contributors work with a simpler flow view.

 The product is most useful when sequencing and handoffs matter: launches, implementations, engineering releases, client delivery, construction-style plans, capstones, and cross-team programs.

## Which scheduling features are included?

 Capability Current GanttFather behavior

 Interactive Gantt Drag and resize scheduled tasks

 Dependencies FS, SS, FF, and SF with lag or lead

 Critical path Calculated from the project schedule

 Kanban Synchronized with the same tasks

 Resources Human and virtual resources with cost fields

 Collaboration Real-time editing plus viewer and guest access

 Excel Import and export workflows

 Public API Versioned REST endpoints with token auth

 AI agents Remote MCP server and agent tools

 Azure DevOps Reviewed Pull and Push

 GanttFather does **not** currently provide automatic resource leveling or a dedicated baseline-overlay feature. Those limits matter for organizations that require advanced resource optimization or formal baseline variance reporting.

## What is included in the free tier?

 The current free capacity is one owned project with two active editor seats. Viewers and guests do not consume those editor seats. Editing a project owned by someone else does not consume one of your owned-project slots.

 Paid capacity adds owned projects and active editors. Current list pricing is **$5 per additional project per month** or **$30 per year**, and **$2 per additional active editor per month** or **$12 per year**. Use the [live pricing page](https://ganttfather.com/pricing/) for localized currency, tax, and current checkout terms.

 The safe way to describe the model is “features available across plans; paid capacity adds projects or editors,” not an unlimited promise. API quotas, collaboration roles, project ownership, and operational limits still apply.

## How does GanttFather compare with popular alternatives?

 This snapshot uses annual list pricing where vendors publish it and avoids pretending unlike products are identical.

 Product Entry point relevant to Gantt planning Important current limit

 GanttFather Free: 1 owned project, 2 editors, unlimited viewers/guests No auto resource leveling or dedicated baseline overlay

 TeamGantt Free: 1 project, 40 tasks; Basic $240/year as a project bundle Free plan is tightly task-limited

 Asana Starter $10.99/user/month annually for Timeline and Gantt Personal is capped at 2 users and lacks Gantt

 monday.com Standard $12/seat/month annually for Gantt Seat buckets; baseline is Pro+

 ClickUp Unlimited $7/user/month annually Free Gantt has 60 non-resetting uses

 GanttPRO No permanent free plan; 14-day trial Price varies by team-size band

 Smartsheet Pro $9/member/month annually No permanent free plan; baseline is on higher tier in the live matrix

 Microsoft Planner Plan 1 $10/user/month annually for Timeline Advanced schedule controls require higher premium plans

 Do not choose only by the cheapest displayed number. Compare the exact team size, project/task limits, viewer rules, dependencies, critical path, baseline, export, and resource requirements.

## How do AI agents work with GanttFather?

 GanttFather offers a remote [Model Context Protocol server](https://ganttfather.com/mcp/) for supported AI clients and a [REST API](https://ganttfather.com/docs/api/introduction/) for deterministic integrations. Tokens can be scoped and permissioned; start read-only and grant writes only for a defined workflow.

 An agent can use available tools to inspect and update project data, but it does not become the accountable project manager. MCP critical-path analysis currently assumes finish-to-start dependency logic, so schedules using SS, FF, or SF links need extra human review.

## How does the Azure DevOps integration work?

 Setup triggers the initial import from a configured Azure DevOps query or board. Later, reviewed Pull and Push are the default flows: Pull keeps conflicting local dates or statuses unless you choose Restore from Azure, while a confirmed Push can overwrite newer mapped Azure values. Pulling first is optional, and estimates are never pushed.

 It is not a continuous two-way sync. Azure Predecessor/Successor links are not imported as GanttFather dependencies, and MCP does not expose integration-management tools. Read the [current Azure DevOps guide](https://ganttfather.com/article/gantt-azure-devops-integration-guide/) before connecting a production board.

## Who is GanttFather best for?

 GanttFather is a strong fit for a small scheduling group with many read-only stakeholders, a team migrating from spreadsheets, or an AI-assisted workflow that needs an inspectable Gantt schedule. It is a weaker fit when mandatory requirements include automatic resource leveling, a dedicated baseline overlay, on-premises deployment, or a broad enterprise workflow ecosystem.

## What is the fastest way to evaluate GanttFather?

 Create one representative project, import or enter a real task set, add the dependencies that drive a milestone, invite a second editor, and share a viewer link. Then test the critical path, Excel round trip, and one API or MCP read before considering migration.

 Evaluate the limitations too: model a resource conflict and a baseline-review use case so the team knows which controls remain manual.

 [Start a free GanttFather project](https://ganttfather.com/) and evaluate it with real schedule logic rather than a polished demo.

## Frequently asked questions

### Is GanttFather free?

 The current free tier covers one project you own, two active editors, and unlimited viewers and guests. Verify current commercial terms on the pricing page.

### Does GanttFather support all four dependency types?

 Yes. You can model finish-to-start, start-to-start, finish-to-finish, and start-to-finish relationships with lag or lead.

### Does GanttFather have a baseline feature?

 It does not currently have a dedicated baseline-overlay feature. Preserve formal approved dates in the appropriate governance record when baseline variance is required.

### Does GanttFather automatically level resources?

 No. It can show assignments and costs, but resource-leveling decisions remain manual.

### Can viewers use GanttFather without consuming an editor seat?

 Yes. The current model provides unlimited viewer and guest access; active editors are the constrained collaboration role.

### Is GanttFather related to Henry Gantt?

 Only by inspiration and name. GanttFather is a modern software product with no family or corporate affiliation to Henry Gantt.

## Sources

- [GanttFather pricing](https://ganttfather.com/pricing/)

- [GanttFather API documentation](https://ganttfather.com/docs/api/introduction/)

- [GanttFather MCP documentation](https://ganttfather.com/mcp/)

- [TeamGantt pricing](https://www.teamgantt.com/pricing)

- [Asana pricing](https://asana.com/pricing)

- [monday.com pricing](https://monday.com/pricing)

- [ClickUp pricing](https://clickup.com/pricing)

- [GanttPRO pricing](https://ganttpro.com/pricing/)

- [Smartsheet pricing](https://www.smartsheet.com/pricing)

- [Microsoft Planner pricing](https://www.microsoft.com/en-us/microsoft-365/planner/microsoft-planner-business-plans-and-pricing)

 ![](https://ganttfather.com/logo-hero.png) Want to skip the reading?

 GanttFather is free forever &mdash; no card, no trial.

[Start free](https://app.ganttfather.com/login)

 Need help?

 Reach out to our team &mdash; we're happy to help.

support@ganttfather.com

 Next up

 [Integrations & AI Azure DevOps Dependencies in a Gantt Chart: Complete Guide](https://ganttfather.com/article/azure-devops-dependencies-gantt-chart/)[Integrations & AI How to Connect Claude to Your Project Schedule With MCP](https://ganttfather.com/article/connect-claude-to-project-schedule-mcp/)[Integrations & AI How to Visualize Azure DevOps Work Items on a Gantt Chart](https://ganttfather.com/article/gantt-azure-devops-integration-guide/)

 ![](https://ganttfather.com/logo-hero.png) GanttFather

 The Don of Project Management

 Every feature included &mdash; Gantt, Kanban, dependencies, critical path, real-time sync, Excel and AI agents. Free tier includes 1 project you own, 2 editor seats, and unlimited viewers and guests.

[Start free](https://app.ganttfather.com/login)