---
title: "How to Upgrade Your GanttFather Plan or Add Editors | GanttFather Blog"
description: "Open the Plan tab of your workspace, then add a project or an editor and pay through Stripe. Prices: Project $5 a month, Editor $2 a month."
canonical: "https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/"
locale: "en"
category: "product"
---

# How to Upgrade Your GanttFather Plan or Add Editors | GanttFather Blog

# How to Upgrade Your GanttFather Plan or Add Editors

 Open the Plan tab of your workspace, then add a project or an editor and pay through Stripe. Prices: Project $5 a month, Editor $2 a month.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 14, 2026 8 min read

 The short answer

 Open the Plan tab of your workspace, then add a project or an editor and pay through Stripe. Prices: Project $5 a month, Editor $2 a month.

## How do you upgrade your GanttFather plan?

 **Open the workspace’s settings with the gear next to its name in the sidebar, go to the Plan tab, then click Add a project or Add an editor.** Stripe Checkout opens, you pay, and the new capacity appears in your plan. GanttFather has no feature tiers: every feature is free. You pay only for more projects and for editors beyond the 2 included with each project.

 Your plan includes 2 editors per project, to share out as you like. A person uses one, even if they edit every project. Whoever pays uses none, and viewing is free.

## Before you start

- Only the owner who pays for the workspace buys projects and editors. Other owners and Administrators see “Tell whoever pays” instead. Editing a project in someone else’s workspace costs you nothing.

- Your email address must be verified. Without it, buying stops and asks you to verify it first.

- Viewers are always free, so adding them never needs an upgrade.

## What does each option cost?

 What you add Monthly Billed yearly What you get

 Project $5 per month $30 per year ($2.50 per month) One more project, with 2 editors besides whoever pays

 Editor $2 per month $12 per year ($1 per month) One more editor beyond the 2 included with each project

 Your first project is free, with 2 editors, no card and no time limit. The yearly option saves 50%.

 Prices show in your local currency when it is available and in US dollars otherwise. They show in euros if you buy from Austria, Belgium, Germany, Ireland, the Netherlands or Portugal. An account keeps the currency of its existing Stripe customer, so if you already paid in one currency, that currency stays.

 These are the prices on the [pricing page](https://ganttfather.com/pricing/); the amount you pay is the one Checkout shows.

## How do you see your current plan?

- Click the gear next to the workspace’s name in the sidebar.

- Open the **Plan** tab.

- Read the counters at the top: **Projects** (used of total) and **Editors** (used of total, with “viewing is free”).

- Under your subscriptions, read each paid item: its name (**Project** or **Editor**), price, billing period and **Renews** or **Ends** date.

 The **People** tab of the same workspace shows who uses each editor. The Plan tab says who pays.

## How do you add a project or an editor?

- Open the workspace’s **Plan** tab.

- Choose a billing period: **Monthly** or **12 months** (marked Save 50%).

- Click **Add a project** or **Add an editor** on the card you need.

- Pay on the Stripe page that opens.

- Stripe returns you to the Plan tab, and the new item appears under your subscriptions.

 If you leave Checkout without paying, nothing is charged.

## When do you need another editor?

 A person uses one editor of the plan, however many projects of the workspace they edit. When the plan has no room, GanttFather says how many editors are missing and gives you three ways out: add editors to the plan, leave the person as a Viewer (free), or cancel. See [How to invite people and add them to several projects](https://ganttfather.com/article/how-to-invite-people-to-several-projects-in-ganttfather/).

 When all the projects of your plan are in use, the **+** next to the workspace’s name says so and opens the Plan tab, where you can add a project.

## What happens after you pay?

 Each purchase, of a Project or of Editors, has its own subscription and its own billing cycle. You can mix monthly and yearly ones and cancel one without touching the others. See [How to cancel a GanttFather subscription](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/). Paid plans include a 7-day refund window.

## Common problems

 Symptom Cause Fix

 Buying stops and asks you to verify your email Your email address is not verified. Verify it from the reminder in the app, then buy again.

 Checkout does not start Checkout could not be created. Try again. If it repeats, write to support@ganttfather.com.

 A person cannot edit even though you paid They are a Viewer, or the plan has no room. Open the workspace’s **People** tab and check the counter and the person’s role.

 The price is not in dollars Prices follow your country when a local price exists. Check the currency on the Checkout page before paying.

 The plan shows a failed payment A renewal payment failed. Update the payment method next to the subscription.

## Related guides

- [How to cancel a GanttFather subscription](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)

- [How GanttFather counts editors](https://ganttfather.com/article/how-ganttfather-counts-editors/)

- [How to delete your GanttFather account](https://ganttfather.com/article/how-to-delete-ganttfather-account/)

- [Pricing](https://ganttfather.com/pricing/)

- [Features](https://ganttfather.com/features/)

## What does GanttFather cost to run a team schedule?

 GanttFather keeps every feature free: the Gantt chart, critical path, boards, sharing and the AI assistant connection all work on the free project. Your first project includes 2 editors besides whoever pays, and viewers are unlimited. You add a paid Project or Editor only when you outgrow that, and whoever holds the plan is the only one billed.

 [Start free with your first project](https://ganttfather.com/) and open the Plan tab of your workspace whenever you need more room.

## Frequently asked questions

### Do viewers cost anything?

 No. Viewers are free and unlimited on every plan, including the free one.

### Who pays when I edit someone else’s project?

 Whoever pays for that workspace. You never use one of your own editors there. In that workspace you use one editor, however many of its projects you edit.

### What happens if I stop paying?

 Nothing is deleted: your projects, your data and your history stay. While your plan is smaller than what you use, you cannot add projects or editors, and the editors who no longer fit become viewers, newest first, until you resume.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 billing pricing upgrade editors how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product Gantt, List and Board views in GanttFather: what each shows](https://ganttfather.com/article/gantt-list-and-board-views-in-ganttfather/)
