---
title: "How to Sign In to GanttFather or Create an Account | GanttFather Blog"
description: "Sign in with Google, GitHub or email and password, create an account with the Sign Up form, and reset a forgotten password from the sign-in screen."
canonical: "https://ganttfather.com/article/how-to-sign-in-to-ganttfather/"
locale: "en"
category: "product"
---

# How to Sign In to GanttFather or Create an Account | GanttFather Blog

# How to Sign In to GanttFather or Create an Account

 Sign in with Google, GitHub or email and password, create an account with the Sign Up form, and reset a forgotten password from the sign-in screen.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 1, 2026 6 min read

 The short answer

 Sign in with Google, GitHub or email and password, create an account with the Sign Up form, and reset a forgotten password from the sign-in screen.

## How do you sign in to GanttFather?

 **Go to the GanttFather app and click Sign in with Google or Sign in with GitHub, or enter your email and password and click Sign In.** The sign-in screen puts the method you used last first and marks it “Last used”. New here? Click “Don’t have an account? Sign up”.

## Before you start

- Use the same method you signed up with. An account made with Google or GitHub has no password, so the email form will not work for it.

- If two-factor authentication is on for your account, have your authenticator app ready.

## How do you sign in?

- Open the GanttFather app. The screen reads **Welcome back**.

- Click **Sign in with Google** or **Sign in with GitHub**. Or, if the email form is not already open, click **Sign in with email and password** to open it.

- For the email form, enter your **Email** and **Password**, then click **Sign In**. A button next to the field shows or hides the password.

- If two-factor authentication is on, the screen **Two-factor authentication** asks for “the 6-digit code from your authenticator app”. Enter it under **Verification code** and click **Verify**.

 You land in your projects.

## How do you create an account?

- On the sign-in screen, click **Don’t have an account? Sign up**.

- Click **Google** or **GitHub**, or fill in **First Name**, **Last Name**, **Email**, **Password** and **Confirm Password**.

- Tick the box to agree to the Terms of Service, Privacy Policy and Cookie Policy. Without it you see “You must accept the Terms of Service and Privacy Policy to create an account.”

- Click **Sign Up**.

 A password needs at least 8 characters, one uppercase letter, one lowercase letter, one number and one special character. Verify your email address afterwards: the app shows “Please verify your email address to access all features.” with a **Verify Email** button, and you can resend the message. Check your spam folder if you do not see it.

## How do you recover a forgotten password?

- On the email form, click **Forgot password?** next to the password field.

- Enter your email and click **Send email**.

- Open the email. If the account uses a password, it holds a link to set a new one. If the account uses Google or GitHub, the email says which.

 The screen answers the same way whether or not an account exists: “If an account uses this address, an email is on its way”. You can resend after a short countdown.

## Common problems

 Symptom Cause Fix

 ”Email or password is incorrect. If you signed up with Google or GitHub, use that button instead.” Wrong password, or the account uses Google or GitHub. Use the button you signed up with, or recover the password.

 ”An account already exists with this email address. Please sign in using the method you originally registered with.” The email is tied to another sign-in method. Sign in with the original method.

 ”Your session has expired” The sign-in lapsed. Sign in again.

 No reset email It is in spam, or the address has no password account. Check spam, then resend after the countdown.

 ”Invalid verification code. Try again.” The two-factor code expired or was mistyped. Enter the current code from your authenticator app.

## Related guides

- [How to change the language in GanttFather](https://ganttfather.com/article/how-to-change-language-in-ganttfather/)

- [How to delete your GanttFather account](https://ganttfather.com/article/how-to-delete-ganttfather-account/)

- [How to make a Gantt chart online](https://ganttfather.com/article/how-to-make-gantt-chart-online/)

## Is there anything to pay for before you try GanttFather?

 No. You can create an account with Google, GitHub or email, and your first project is free with 2 editors, every feature included, no card and no time limit. Viewers are unlimited.

 [Create your free GanttFather account](https://ganttfather.com/) and start your first plan.

## Frequently asked questions

### Which sign-in methods does GanttFather offer?

 Google, GitHub, and email with a password. Two-factor authentication with an authenticator app is supported when it is on for the account.

### Can I use the same email with Google and with a password?

 If the email is already registered with another method, the app tells you to sign in with the method you originally registered with.

### Does my browser remember my sign-in?

 The sign-in form works with your browser and password manager, which can fill it in and offer to save it.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 sign in account password login how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)
