# How to save and restore a version in GanttFather | GanttFather Blog

# How to save and restore a version in GanttFather

 Save a named version of your project, preview an older version in its own tab and restore it with one click. Owners and Admins only; later changes stay in history.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 1, 2026 6 min read

 The short answer

 Save a named version of your project, preview an older version in its own tab and restore it with one click. Owners and Admins only; later changes stay in history.

 To save a version, click **History** in the project toolbar, open the **Versions** tab, click **Save version**, give it an optional name and confirm. To go back, find the version, click **Preview** to check it, then click **Restore**. The whole project returns to that state, and the changes made since stay in history.

 GanttFather saves versions of the whole project (tasks, dates, status, assignments and dependencies). It is not a baseline feature. There are no baseline bars on the Gantt chart, and you compare a version by previewing it.

## Before you start

- Saving and restoring need the Owner or Admin role. Every member can open History and preview versions.

- Saving and restoring are blocked in a read-only project, such as a locked or archived one. You can still preview.

## How to save a version

- Open the project and click **History** in the toolbar.

- Open the **Versions** tab.

- Click **Save version**.

- Type a name in “Version name (optional)”, for example “Approved plan”. The name can have up to 120 characters.

- Confirm the dialog.

 The new version appears at the top of the list, with your name as its title. A version without a name is listed as “Saved snapshot”.

## How to preview a version

- In **History**, hover over a version and click **Preview**.

- The version opens in a new browser tab with the banner “Viewing version of {date} — read only”.

 The preview shows that version’s own dates, statuses and assignments, not today’s values. Nothing you do in the preview changes the project, so you can compare it with the live chart tab side by side.

## How to restore a version

- In **History**, hover over the version you want and click **Restore**. You can also click **Make this the current version** in the preview tab.

- Read the warning. It says how many changes since that version will be undone, and that they stay in history and can be restored forward.

- Confirm.

 You see a new “Version restored” row at the top of the **Versions** list. The Gantt, List and Board views show the restored plan.

## What happens next

- Restoring adds to the history. It does not erase the versions or the edits after the one you chose. To undo a restore, restore the version that was current before it.

- **Undo** is separate. Ctrl+Z (⌘Z on a Mac) undoes your last change. Each undo adds a “Change undone” row.

- GanttFather also saves automatic versions. They show as “Automatic snapshot” with an **Auto** badge. When a project has versions you saved, the tab hides the automatic ones. Tick **Show automatic versions** to see them. Versions you saved are not removed automatically.

- Before an Excel import, and before a pull or push with Azure DevOps, GanttFather saves a restore point for you. These appear in the same list.

- The **All activity** tab lists individual edits. You can preview or restore from an edit too.

## Common problems

- **No Save version or Restore button.** Only Owners and Admins can save or restore. Ask one of them, or ask for the role.

- **“This version predates version history and can’t be restored.”** History started at the “Version history started” row. Changes made before it were not recorded, so earlier states cannot be previewed or restored.

- **“Couldn’t restore — the project kept changing. Try again.”** Someone edited the project while the restore ran. Try again.

- **Edits made through an AI assistant cannot be restored one by one.** Edits made through the MCP connection do not carry their own snapshot. Restore to a version saved before or after them.

- **Restore is disabled but Preview works.** The project is read-only, for example locked or archived. Preview stays available.

## Related guides

- [Project schedule baseline guide](https://ganttfather.com/article/project-schedule-baseline-guide/)

- [How to import and export Excel in GanttFather](https://ganttfather.com/article/how-to-import-and-export-excel-in-ganttfather/)

- [How to create recurring tasks and duplicate tasks](https://ganttfather.com/article/how-to-create-recurring-tasks-and-duplicate-tasks/)

- [GanttFather features](https://ganttfather.com/features/)

## Can you keep versions of a plan in GanttFather?

 Yes. Save a named version before a big change, such as a re-plan or an Excel import, preview it in its own tab, and restore it if the change goes wrong. GanttFather does not draw baseline bars, so use a named version as the approved plan and preview it next to the live chart.

 [Open a free GanttFather project and save your first version](https://ganttfather.com/) before you reschedule.

## Frequently asked questions

### Does GanttFather have baselines?

 No. It has saved versions that you can preview and restore, but it does not show baseline bars on the chart.

### Does restoring a version delete my later changes?

 No. They stay in history, and the restore itself can be reversed.

### Who can restore a version?

 Owners and Admins. Every member can preview a version.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 version-history restore history how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)