---
title: "How to invite people and set roles in GanttFather | GanttFather Blog"
description: "Invite a teammate by email from Share, choose Administrator, Editor or Viewer, and change or remove a role from the project's People page. Includes editor rules and invitation problems."
canonical: "https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/"
locale: "en"
category: "product"
---

# How to invite people and set roles in GanttFather | GanttFather Blog

# How to invite people and set roles in GanttFather

 Invite a teammate by email from Share, choose Administrator, Editor or Viewer, and change or remove a role from the project's People page. Includes editor rules and invitation problems.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 14, 2026 9 min read

 The short answer

 Invite a teammate by email from Share, choose Administrator, Editor or Viewer, and change or remove a role from the project's People page. Includes editor rules and invitation problems.

 To invite someone, open the project, click **Share** in the top bar and choose **Invite people**. Type their email, choose a role (Administrator, Editor or Viewer) and click **Send invitation**. They get an email with a link; when they open it and sign in with that address, they join the project with that role.

 To change a role later, open the project’s settings with the gear next to its name, go to **People**, and use the role list on the person’s row. To remove someone, use the menu on the same row.

## Before you start

- You must be an owner of the workspace or an Administrator of the project to invite, change roles or remove people. Editors and Viewers can see the list only.

- A read-only project cannot take new invitations or role changes.

- Your plan includes 2 editors per project, to share out as you like. A person uses one, even if they edit every project. Whoever pays uses none, and viewing is free.

- The invitation email goes to one address at a time. Commas, semicolons and line breaks are not accepted.

## What each role can do

 Role See the project Edit tasks Invite, change roles, remove people, share outside Uses an editor

 Owner (of the workspace) Yes, every project Yes Yes, and creates, moves and deletes projects Yes, except the owner who pays

 Administrator Yes Yes Yes Yes

 Editor Yes Yes No Yes

 Viewer Yes (view-only) No No No

 A workspace can have several owners. See [Roles in GanttFather](https://ganttfather.com/article/roles-owner-administrator-editor-viewer-in-ganttfather/).

## How to invite someone

- Open the project and click **Share** at the top, then **Invite people**.

- Type the person’s address in **Email**.

- Choose **Administrator**, **Editor** or **Viewer**. Each role shows whether it uses an editor of your plan. The default is **Editor**.

- Read the line under the roles. It shows the counter as it would be, for example “With this: Editors 6 of 24”.

- Click **Send invitation**.

 Until they accept, the person appears in the list of invitations “not accepted yet” in People, with **Resend** and **Withdraw**.

## How to change someone’s role

- Open the project’s settings (the gear next to its name) and go to **People**.

- In the **Role** column of the person’s row, choose **Administrator**, **Editor** or **Viewer**.

 A Viewer cannot go straight to Administrator: make them an Editor first. You cannot change your own role from this list.

## How to remove someone

- In **People**, open the menu on the person’s row and choose to remove them.

- Read the dialog. It says how many tasks stay in their name, for example “Their 4 tasks stay in their name, with no access, and return to them if they come back.”

- Confirm.

 The person loses access. Their tasks stay on a resource marked **No longer here**. See [How to remove a person from a project](https://ganttfather.com/article/how-to-remove-a-person-from-a-project-in-ganttfather/).

## What happens next

- **Editors.** An invitation to edit holds one editor from the moment you send it, until the person accepts, you withdraw it or it expires. An invitation as **Viewer** holds none. If the plan has no room, GanttFather shows how many editors are missing and what you can do. See [How to invite people and add them to several projects](https://ganttfather.com/article/how-to-invite-people-to-several-projects-in-ganttfather/).

- **Signing in.** The invited person must sign in with the same email address the invitation went to. If they use another account, GanttFather says “Wrong account” and offers **Switch account**. You can also invite the address they are using now.

- **Viewers who want to edit.** A viewer sees a **Request edit access** button. You then see **Wants edit access** on their row with **Accept** and **Reject**. Accepting makes them an Editor and needs room in the plan.

- **Sending the email again.** On a pending row, use **Resend**. It shows a countdown when you must wait before sending again.

## Common problems

- **“The invitation email could not be sent — share this link manually.”** The invitation exists, but the email did not go out. Use **Copy** in the dialog, or the copy-link action in the row menu, and send the link yourself. A reason is shown when the email was refused, for example a daily limit or an unverified sender address.

- **“This invitation was sent to a different email address than the one you’re signed in with.”** The invitee is signed in with another account. They click **Switch account**, or you invite the address they use.

- **“User … is already a member or invited”.** The address is already on the list. Look for it in People; a pending invitation shows under invitations not accepted yet.

- **The Invite button is missing.** You are not an owner or an Administrator, or the project is read-only.

## Related guides

- [How to invite people and add them to several projects](https://ganttfather.com/article/how-to-invite-people-to-several-projects-in-ganttfather/)

- [A project’s settings page and your account settings](https://ganttfather.com/article/project-settings-and-account-settings-in-ganttfather/)

- [How to share a project with a view-only link](https://ganttfather.com/article/how-to-share-a-ganttfather-project-with-a-view-only-link/)

- [Gantt, List and Board views in GanttFather](https://ganttfather.com/article/gantt-list-and-board-views-in-ganttfather/)

- [How to upgrade your GanttFather plan](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)

- [GanttFather pricing](https://ganttfather.com/pricing/)

## How do you add a team to a project in GanttFather?

 Invite each person by email from Share and pick a role: Administrator and Editor can edit the plan, Viewer is read-only and free. Everyone works on one live schedule, and changes show up for the others as they are made.

 Your first project includes 2 editors besides whoever pays, and you can add more when you need them. Stakeholders who only need to look can be Viewers, or can open a public view-only link without an account. GanttFather does not have comments, so keep discussion in your usual chat tool.

 [Start a free GanttFather project and invite your first teammate](https://ganttfather.com/).

## Frequently asked questions

### Does a Viewer cost anything?

 No. Viewers are always free. Administrators and Editors each use one editor of the plan, however many projects they edit.

### Can an Editor invite other people?

 No. Only owners and Administrators can invite people, change roles or remove members.

### Can I invite someone who does not have an account yet?

 Yes. The invitation goes to their email address. They sign up or sign in with that address and join the project from the link.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 team invite roles permissions how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)[Product Gantt, List and Board views in GanttFather: what each shows](https://ganttfather.com/article/gantt-list-and-board-views-in-ganttfather/)
