---
title: "How to Delete Your GanttFather Account | GanttFather Blog"
description: "Delete your account in Settings, Account, Delete account. You confirm your email and sign in again; active subscriptions stop right away."
canonical: "https://ganttfather.com/article/how-to-delete-ganttfather-account/"
locale: "en"
category: "product"
---

# How to Delete Your GanttFather Account | GanttFather Blog

# How to Delete Your GanttFather Account

 Delete your account in Settings, Account, Delete account. You confirm your email and sign in again; active subscriptions stop right away.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 1, 2026 6 min read

 The short answer

 Delete your account in Settings, Account, Delete account. You confirm your email and sign in again; active subscriptions stop right away.

## How do you delete your GanttFather account?

 **Click your photo at the top right, open Account, click Delete account, type your email address, confirm with your password (or sign in again with Google or GitHub), and click Delete my account.** The account closes right away and you can no longer sign in. The dialog says your data is kept for up to 90 days, then deleted.

## Before you start

- Your email address must be verified. If it is not, the dialog asks you to verify it first and lets you resend the email from the Account page.

- You cannot delete the account while you pay for a workspace whose projects other people use. The dialog lists those projects and the number of other people. Move each project to the workspace of someone who will run it (**Move project**, under **General** in the project’s settings), or remove the other people, then come back.

- Your tasks stay in the projects you leave, on a resource that shows “Former member”, with no name, colour or initials.

- Active subscriptions stop right away when the account closes. A payment made in the last 7 days is refunded. The dialog shows how many subscriptions you have.

- If you want to keep your data, export it first.

## Steps

- Click your photo at the top right and choose **Account**.

- Scroll to the red **Delete account** card and click **Delete account**.

- Wait for “Checking your account…” to finish. The dialog is titled **Delete your account**.

- Read the notice: your account closes right away, and your data is kept for up to 90 days, then deleted.

- Where the dialog says “Type” followed by your email address “to confirm”, type the email address of this account.

- If you sign in with a password, type it under **Your password**. If you sign in with Google or GitHub, you are asked to sign in again when you confirm. If two-factor authentication is on, enter the code from your authenticator app when asked.

- Click **Delete my account**.

 You then see **Your account is closed** with the note: “If you change your mind, write to support@ganttfather.com within 90 days.” Click **Done** and GanttFather signs you out.

## Common problems

 Symptom Cause Fix

 The **Delete my account** button is off The email does not match, the email is not verified, or a shared project blocks it. Type the exact account email, verify it, or move the shared projects.

 ”Other people use these projects.” You pay for a workspace with projects that other people use. Move it to another workspace in its settings, or remove the other people.

 ”Please sign in again and try once more.” Closing needs a recent sign-in. Sign out, sign in, and repeat the steps.

 ”That password isn’t right.” Wrong password. Retype it, or use the password reset link in the dialog; the app then says a reset link was sent to your email.

 ”We couldn’t cancel your subscriptions, so your account is still open.” The subscription cancellation failed. Try again. Your account stays open until it succeeds.

## Related guides

- [How to cancel a GanttFather subscription](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)

- [How to sign in to GanttFather or create an account](https://ganttfather.com/article/how-to-sign-in-to-ganttfather/)

- [Privacy policy](https://ganttfather.com/privacy/)

## Do you need to delete your GanttFather account to stop paying?

 No. If cost is the reason, cancel the paid Project or Editor instead. The free project keeps working with every feature, 2 editors and unlimited viewers, and nothing is closed or deleted.

 Delete the account only when you want it gone. To keep using the tool without paying, [open GanttFather](https://ganttfather.com/) and cancel from the Plan tab of your workspace.

## Frequently asked questions

### Is deleting the account permanent?

 Your account closes right away and you cannot sign in. The dialog says your data is kept for up to 90 days, then deleted, and the app’s closed-account note says: “If you change your mind, write to support@ganttfather.com within 90 days.”

### Does deleting the account cancel my subscriptions?

 Yes. Active subscriptions stop right away, and a payment made in the last 7 days is refunded.

### Can I delete the account if my team uses my project?

 Not while the project has other members. Move each shared project to another workspace in its settings, or remove the other people, then try again.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 account delete account privacy how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)
