---
title: "How to Create a Project in GanttFather | GanttFather Blog"
description: "Create a GanttFather project: click New Project, then start blank or use a template with dated tasks, milestones, and dependencies already in place."
canonical: "https://ganttfather.com/article/how-to-create-a-project-in-ganttfather/"
locale: "en"
category: "product"
---

# How to Create a Project in GanttFather | GanttFather Blog

# How to Create a Project in GanttFather

 Create a GanttFather project: click New Project, then start blank or use a template with dated tasks, milestones, and dependencies already in place.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 1, 2026 7 min read

 The short answer

 Create a GanttFather project: click New Project, then start blank or use a template with dated tasks, milestones, and dependencies already in place.

 To create a project in GanttFather, click the **+** next to your workspace’s name in the left sidebar, choose **Start blank** or **Use a template**, name the project, and click **Create project**. The new project opens right away. A blank project is empty; a template project arrives with phases, dated tasks, milestones, and dependencies that you can edit.

## Before you start

- You need a signed-in GanttFather account. A new account lands on the project start screen by itself.

- Your plan has a project limit. If you are at it, the **+** says so and opens the workspace’s Plan tab, where you add a project. Only the owners of a workspace create projects in it. See [pricing](https://ganttfather.com/pricing/) for the current plans.

## Create a blank project

- Click the **+** next to your workspace’s name in the left sidebar.

- On **How do you want to start?**, select **Start blank** and click **Continue**.

- Under **Name your project**, type a name in **Project name** (for example, “Product launch”). The name can be changed later on the project’s settings page, under **General**.

- Click **Create project**.

 The project opens empty. Nothing is added for you, so the next step is to [add your first tasks](https://ganttfather.com/article/how-to-add-tasks-and-subtasks-in-ganttfather/).

## Create a project from a template

- Click the **+** next to your workspace’s name in the left sidebar.

- On **How do you want to start?**, select **Use a template** and click **Continue**.

- On **Choose your template.**, compare the starting plans. Use **Filter templates** or a category to narrow the list.

- Click **Preview plan** on a template to see its phases, tasks, milestones, and dates before anything is created.

- Click **Review this template**.

- On **Review your template project**, enter the **Project name** and pick the **Selected start date**.

- Check **Adjusted working start** and **Calculated end**. If you pick a weekend or other non-working day, GanttFather moves the start to the next working day and calculates the end from there.

- Click **Create project**.

 You can also browse the full library first at [GanttFather templates](https://ganttfather.com/templates/) and open one in the app from there. The link only opens the review screen; it never creates a project on its own.

 A template copies its plan only. Members, credentials, integrations, and files are not copied.

## Bring existing work

 The **Bring existing work** card imports a spreadsheet file once. It also appears next to a card for Azure DevOps when that connection is available for your account. For the Azure DevOps path, read the [Azure DevOps integration guide](https://ganttfather.com/article/gantt-azure-devops-integration-guide/).

## What happens next

- The project belongs to the workspace you created it in. You are its owner there, and its people are on the project’s settings page, behind the gear next to its name.

- A project you create is a normal project: tasks, dependencies, views, and sharing all work the same whichever start path you chose.

- If you close the start screen midway, nothing is created. You can reopen the **+** any time. For an account with other projects, a **Close** action is available on every step.

## Common problems

- **Symptom:** a small “Create New Project” box asks only for a name. **Cause:** the guided start screen is not available for your account at that moment, so GanttFather falls back to the name-only dialog. **Fix:** type the name and create the project; you can add tasks afterwards.

- **Symptom:** “Project name cannot exceed 100 characters.” **Cause:** names are limited to 100 characters. **Fix:** shorten the name.

- **Symptom:** “Letters, numbers, spaces, and basic punctuation are allowed.” **Cause:** characters such as angle brackets, quotes, or backslashes are not accepted in project names. **Fix:** remove them.

- **Symptom:** “Your project limit has been reached. Review Billing, then retry this attempt.” **Cause:** your account has no free project capacity. **Fix:** open Billing, add project capacity, then retry.

- **Symptom:** a message that creation could not be confirmed and the attempt can be retried safely. **Cause:** the connection dropped before GanttFather heard back. **Fix:** use the **Retry this attempt** button (**Retry this exact attempt** on the template path). Do not start a new attempt first, because the project may already exist.

## Related guides

- [How to add tasks and subtasks in GanttFather](https://ganttfather.com/article/how-to-add-tasks-and-subtasks-in-ganttfather/)

- [How to set task dependencies in GanttFather](https://ganttfather.com/article/how-to-set-task-dependencies-in-ganttfather/)

- [How to turn on and read the critical path in GanttFather](https://ganttfather.com/article/how-to-turn-on-and-read-the-critical-path-in-ganttfather/)

- [How to make a Gantt chart online](https://ganttfather.com/article/how-to-make-gantt-chart-online/)

- [Project templates](https://ganttfather.com/templates/) and [features](https://ganttfather.com/features/)

## How do you start a project in GanttFather?

 Open GanttFather, click New Project, and pick Start blank for an empty plan or Use a template for phases, dated tasks, milestones, and dependencies you can edit. You see the calculated schedule before anything is created, and the project opens as soon as you click Create project.

 [Create your first GanttFather project](https://ganttfather.com/) and add tasks, links, and a critical path in the same session.

## Frequently asked questions

### Can I change the project name later?

 Yes. The start screen says the name can be changed later in project settings.

### Does opening a template from the template library create a project?

 No. The link opens the review screen in the app. A project is created only when you click **Create project**.

### What start date does a template use?

 The date you pick on **Review your template project**. If it is not a working day, GanttFather uses the next working day and shows it as **Adjusted working start**.

### Does a blank project include sample tasks?

 No. A blank project opens empty.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 gantt-chart how-to new-project templates getting-started

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)
