# How to Change Your GanttFather Notification Settings | GanttFather Blog

# How to Change Your GanttFather Notification Settings

 Choose which alerts show in the GanttFather bell, mute a project, and switch the weekly summary and other emails on or off in Settings, Notifications.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 1, 2026 6 min read

 The short answer

 Choose which alerts show in the GanttFather bell, mute a project, and switch the weekly summary and other emails on or off in Settings, Notifications.

## How do you change your notification settings in GanttFather?

 **Click your photo at the top right, choose Notifications, and use the switches in the table.** Each row is a kind of alert and each switch decides whether it shows in GanttFather. Alerts that need you always show. To silence a whole project, mute it from the bell or from the same page.

## What do the groups mean?

 Group What it covers

 Needs you Access requests, a failed payment, invitations that could not be sent, failed reports and syncs

 Assigned to you Someone gives you a task or takes you off one

 Your projects You get access, your role changes, a project becomes read-only

 Reports A report you asked for is ready

 Azure DevOps A sync you started finished

 The note under the table says: “Things that need you always show in GanttFather.” Email and browser push are off by default. The table shows an **Email** column and a **This browser** column only on accounts where they are turned on, and both need **In GanttFather** to be on. When email is on, you get it only for what needs you or was assigned to you, only if you have not seen it in GanttFather within 10 minutes, and at most once every 30 minutes.

## Steps

- Click your photo at the top right.

- Click **Notifications**.

- In the table “What you hear about, and where”, switch a group on or off under **In GanttFather**. Each switch saves on its own.

- If you see an error, the page says “We couldn’t save that change. Try again.” Switch it again.

## How do you mute a project?

- On the same page, find **Muted projects**.

- Click **Mute a project**.

- Type under **Find a project**, then pick the project.

 A muted project stops its updates and its weekly summary. Things that need you still come through. To undo it, use the unmute control next to the project in **Muted projects**. You can also mute from the bell: open the row’s **More actions** menu and choose **Mute this project**.

## How do you control the weekly summary and other emails?

 Under **Other emails** you find these switches:

- **Weekly summary**: a weekly status email for your projects. It pauses while you have not opened a project for 14 days. The day and time of each project are set in its **Reports** then **Schedules**.

- **Reports sent to me**: scheduled reports, and reports people share with you by email.

- **Product updates**: what is new in GanttFather, now and then.

- **Tips**: ideas for getting more out of your plans.

## Where is the bell?

 The bell sits in the top bar and shows tasks assigned to you, requests to edit your project, people who join or are waiting to edit, failed payments, projects that turn read-only, and reports and Azure DevOps syncs you started. Click it for the last 30 days. **Mark all read** clears the unread count, and **Settings** in its footer opens this page. Your notifications are the same on every device.

## Common problems

 Symptom Cause Fix

 Emails do not reach me Earlier messages to your address bounced or were reported. Write to support@ganttfather.com. The page explains this in the Other emails card.

 I see no news from one project The project is muted. Unmute it under **Muted projects**.

 The weekly email stopped It pauses after 14 days without opening a project, or the switch is off. Open a project, and check the **Weekly summary** switch.

 A group cannot be switched off Things that need you always show. This is by design.

## Related guides

- [How to change the language in GanttFather](https://ganttfather.com/article/how-to-change-language-in-ganttfather/)

- [How to sign in to GanttFather or create an account](https://ganttfather.com/article/how-to-sign-in-to-ganttfather/)

- [Features](https://ganttfather.com/features/)

## How does GanttFather keep a team informed without noise?

 The bell shows work assigned to you, access requests, failed payments and finished reports. Your own actions stay as short messages with Undo, and you can mute any project while things that need you still come through.

 [Open GanttFather](https://ganttfather.com/) and set your notifications from Settings once your team is in.

## Frequently asked questions

### Can I turn off everything?

 You can switch off each group under In GanttFather except what needs you, which always shows.

### Do my teammates see my choices?

 No. These are your own notification settings.

### Does a muted project hide access requests?

 No. Things that need you still come through.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 notifications settings email mute how-to

## Next up

 [Product How to Cancel a GanttFather Subscription or Get a Refund](https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/)[Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)