---
title: "How to Cancel a GanttFather Subscription or Get a Refund | GanttFather Blog"
description: "Cancel a paid Project or Editor from the Plan tab: Cancel at renewal keeps access until the period ends, and a refund is possible within 7 days of purchase."
canonical: "https://ganttfather.com/article/how-to-cancel-ganttfather-subscription/"
locale: "en"
category: "product"
---

# How to Cancel a GanttFather Subscription or Get a Refund | GanttFather Blog

# How to Cancel a GanttFather Subscription or Get a Refund

 Cancel a paid Project or Editor from the Plan tab: Cancel at renewal keeps access until the period ends, and a refund is possible within 7 days of purchase.

 ![](https://ganttfather.com/logo.png) GanttFather

 Updated November 14, 2026 7 min read

 The short answer

 Cancel a paid Project or Editor from the Plan tab: Cancel at renewal keeps access until the period ends, and a refund is possible within 7 days of purchase.

## How do you cancel a GanttFather subscription?

 **Open the workspace’s Plan tab, find the subscription under your subscriptions, open its menu and choose Cancel at renewal.** The subscription stays active until the end of the period you already paid for, and you are not charged again. To end it now with your money back, choose Cancel now + refund when that option is offered. Only the owner who pays for the workspace can do this.

## Before you start

- Each purchase, of a Project or of Editors, has its own subscription. Cancel only what you no longer need.

- A refund applies once per subscription and only within 7 days of purchase. After that, you can still cancel at renewal.

- When a subscription ends, nothing is deleted: your projects, your data and your history stay. While your plan is smaller than what you use, you cannot add projects or editors, and the editors who no longer fit become viewers, newest first, until you resume.

## How do you cancel at the end of the period?

- Click the gear next to the workspace’s name in the sidebar and open the **Plan** tab.

- Find the item under your subscriptions.

- Open the menu on the right of that row (the three dots) and choose **Cancel at renewal**.

- Pick the reason that fits in the short survey. The confirm button stays off until you pick one. The note box is optional.

- Click **Cancel at renewal**.

 A message confirms that the subscription will cancel and shows the date. The row now shows a **Canceling** label and “Ends” with the date instead of “Renews”.

## How do you cancel now and get a refund?

- Follow steps 1 to 3 above.

- Choose **Cancel now + refund**. This choice appears only when the subscription is still eligible for a refund.

- Pick a reason, then click **Cancel and refund**.

 The dialog warns that a refund is one per subscription, within 7 days of purchase, and cannot be undone. Afterwards a message shows the refund amount and says it is on its way.

## How do you undo a cancellation?

 Before the end date, open the same menu on the row and choose **Resume subscription**. A message confirms the subscription will keep renewing as usual.

## How do you change your card or see invoices?

 Click **Adjust plan** at the top of your subscriptions. It opens the Stripe billing portal, where you manage payment methods. When a renewal payment fails, the row shows **Past due** and an **Update payment method** button that opens the same portal. Past invoices are listed under **Invoices** in the Plan tab, each with a View link and a Download PDF link. Each invoice names the workspace.

## What happens next?

 The subscription ends on the date shown, and the capacity it gave you goes with it. To get editing back, add a Project or Editor again from the Plan tab.

## Common problems

 Symptom Cause Fix

 No Cancel now + refund option The 7-day window has passed, or a refund was already issued for it. Choose **Cancel at renewal**.

 A message says the 7-day refund window has passed You tried an immediate refund too late. Choose **Cancel at renewal**.

 A message says the subscription is already canceled It was canceled earlier. Check the **Ends** date on the row.

 A message says Stripe could not complete the request Stripe did not answer. Try again in a minute.

 Cancel button is disabled No reason is selected. Pick one reason from the survey list.

 You do not see the subscription You are not the owner who pays. Ask whoever pays, or open the Plan tab with their account.

## Related guides

- [How to upgrade your GanttFather plan or add editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)

- [How GanttFather counts editors](https://ganttfather.com/article/how-ganttfather-counts-editors/)

- [How to delete your GanttFather account](https://ganttfather.com/article/how-to-delete-ganttfather-account/)

- [Pricing](https://ganttfather.com/pricing/)

## Can you keep using GanttFather after you cancel?

 Yes. GanttFather has no paywalled features, so the free project keeps working with every feature, 2 editors and unlimited viewers. Canceling only removes the extra projects or editors you added, and nothing you built is deleted.

 [Open GanttFather](https://ganttfather.com/) and open the Plan tab of your workspace whenever you want to add capacity again.

## Frequently asked questions

### Do I lose my data when I cancel?

 No. Nothing is deleted: your projects, your data and your history stay. While your plan is smaller than what you use, you cannot add projects or editors, and the editors who no longer fit become viewers, newest first, until you resume.

### Can I cancel only one editor?

 Yes. You cancel only the row you choose, and the others stay as they are.

### Is there a refund window?

 Yes, 7 days from purchase, once per subscription. After that, canceling takes effect at the end of the period you already paid for.

 Want to skip the reading?

 GanttFather is free forever, with no card and no trial.

 [Start free](https://app.ganttfather.com/login)

 Tags

 billing cancel refund subscription how-to

## Next up

 [Product How to invite people and set roles in GanttFather](https://ganttfather.com/article/how-to-invite-people-and-set-roles-in-ganttfather/)[Product How to Upgrade Your GanttFather Plan or Add Editors](https://ganttfather.com/article/how-to-upgrade-ganttfather-plan/)[Product Gantt, List and Board views in GanttFather: what each shows](https://ganttfather.com/article/gantt-list-and-board-views-in-ganttfather/)
