---
title: "Instagantt Alternative If You Use Asana (2026) | GanttFather"
description: "Using Asana plus Instagantt for a Gantt chart? What Instagantt costs, its two products, Asana's own Timeline, and a free option that replaces both."
canonical: "https://ganttfather.com/alternatives/instagantt/"
locale: "en"
category: "product"
---

# Instagantt Alternative If You Use Asana (2026) | GanttFather

Instagantt alternative · checked 7 November 2026

# Do you still need Instagantt to get a Gantt chart for Asana?

 If your work stays in Asana, Instagantt for Asana is the closest fit: its free plan covers 3 projects and includes baselines and critical path. If you pay for Asana mainly to feed the chart, GanttFather can replace both. It is free for one project with 2 editors, with all four dependency types. It has no Asana sync and no baselines.

## First, which Instagantt do you mean?

Instagantt sells two products, and the prices below belong to the first.

- **Instagantt for Asana.** It needs an Asana account. It draws a Gantt chart over your Asana projects and keeps tasks and due dates in two-way sync. Instagantt says it is not an Asana replacement.
- **Instagantt Standalone.** A Gantt tool that works without Asana. Some features, such as the Timeline view and the AI assistant, are listed as Standalone only.

If you are an Asana user, you are on the first one. The rest of this page is about leaving that pair, or deciding to keep it.

## What Instagantt costs

 What Instagantt, read on 7 November 2026 Source

 Free (for Asana) 1 user, up to 3 Asana projects; finish-to-start and start-to-start links, milestones, baselines, critical path, public snapshots, CSV export. No PDF or image export, no workload [Pricing](https://instagantt.com/pricing)

 Individual US$10 a month billed yearly (US$120 a year), US$12 monthly; 1 user, unlimited projects; lag and lead, PDF and image export; 7-day trial [Pricing](https://instagantt.com/pricing)

 Teams US$20 a month billed yearly (US$240 a year), US$24 monthly; 3 collaborators, US$8 a month for each extra one; workload and portfolio [Pricing](https://instagantt.com/pricing)

 Dependency types Two: finish-to-start and start-to-start [Compare with Asana](https://www.instagantt.com/compare/asana)

 Baselines In every version, the free one included [Help: baselines](https://www.instagantt.com/help-guide/instagantt-baselines)

 Asana account Needed for the "for Asana" product; Asana is a separate bill [Asana integration](https://www.instagantt.com/product/asana-integration)

Asana's own prices, from [asana.com/pricing](https://asana.com/pricing):
 Personal is free for up to 2 users with no Timeline or Gantt view; Starter is US$10.99 per user a month billed yearly
 (US$13.49 monthly); Advanced is US$24.99 (US$30.49 monthly). Timeline and Gantt views begin at Starter.

## Your options

### Keep Asana, keep the chart: Instagantt for Asana

On the free plan you get a chart over 3 Asana projects for one person, with baselines and a critical path.
 Only one person can work in it; public snapshots let others view. For a team, Teams starts at US$20 a month
 billed yearly for 3 collaborators. For work that must stay in Asana, a two-way sync is the point.

### Keep Asana, drop Instagantt: Asana Timeline

A paid Asana plan has Timeline and Gantt views, so there is one bill. Read
[the limits of Asana's Gantt chart](https://ganttfather.com/article/asana-gantt-chart-timeline-limitations/)
before you decide. Asana's help pages did not load when this page was checked, so its dependency types are not listed here.

### Drop both: GanttFather

GanttFather is free project management software built around the Gantt chart. One project you own is
 free with 2 editors and unlimited viewers. All four dependency types work, with lag or lead in days,
 and moving a task moves what depends on it. A Critical Path button marks the chain that sets your end date.
 Viewers open a link without an account. Extra projects are US$5 a month and extra editors US$2 a month.

### Move the whole team into one tool: ClickUp

ClickUp Free has unlimited members. Its Gantt on Free is a limited trial on the pricing table, while its feature page says
 it is available on the free plan. Critical path is on Business, US$17 per user a month billed yearly. If tasks and
 Gantt should live together, this is the larger step.
 Read on [clickup.com/pricing](https://clickup.com/pricing), 7 November 2026.

## Where Instagantt is better

- **Two-way sync with Asana.** Tasks and due dates stay in step between the two.
- **Baselines and critical path on the free plan.** GanttFather has a critical path but no baselines.
- Workload and portfolio views on Teams, and PDF and image export on the paid plans.
- Nothing has to be rebuilt if your projects already live in Asana.

## Where GanttFather is better

- Four dependency types, where Instagantt has two.
- Viewers cost nothing and need no account, and every feature is in the free plan.
- There is one bill.
- Working calendars, with team days off and each person's days off, are part of the schedule.

## How to move an Asana plan into GanttFather

There is no import from Asana or Instagantt. What works is Excel.

- Export the project from Asana, or from Instagantt as CSV, and open it in Excel.
- Keep one row per task. Rename the worksheet Project_Plan and use GanttFather's headers: Task Name, Owner, Start Date, End Date, Progress and Status. A Lvl column sets which tasks are subtasks.
- In GanttFather, choose **Import / export**, **Import Excel**, **GanttFather format**.
- Check the review screen. Nothing is written until you confirm.
- Make the dependencies again in the Gantt; they do not come across.

Read [the Excel guide](https://ganttfather.com/article/how-to-import-and-export-excel-in-ganttfather/) for the exact columns.
 For a side-by-side table, see [GanttFather vs Instagantt](https://ganttfather.com/vs/instagantt/), or browse
[all alternative pages](https://ganttfather.com/alternatives/).

 Facts on this page checked on 7 November 2026 .

## Frequently asked questions

 Is Instagantt free? There is a free plan of Instagantt for Asana: 1 user and up to 3 Asana projects, with dependencies, milestones, baselines and critical path. It needs an Asana account. The paid plans are Individual at US$10 a month billed yearly and Teams at US$20 a month billed yearly.

 Does Instagantt work without Asana? Yes, in its Standalone version, which is a separate Gantt tool. Instagantt for Asana needs an Asana account and keeps tasks and due dates in two-way sync with it.

 What dependency types does Instagantt have? Two: finish-to-start and start-to-start, according to its own comparison page. GanttFather has all four, with lag or lead in days.

 Can Asana show a Gantt chart without Instagantt? Yes, on a paid plan. Asana's pricing page puts Timeline and Gantt views in Starter and above, at US$10.99 per user a month billed yearly. The Personal plan, up to 2 users, has list, board and calendar views only.

 How do I move from Asana and Instagantt to GanttFather? GanttFather does not read Asana or Instagantt files. Export your tasks, copy the names, owners, dates and progress into an Excel sheet named Project_Plan, and import it as GanttFather format. Then link the tasks again in the Gantt.

 Will GanttFather keep syncing with Asana? No. GanttFather has no Asana connection. It is a separate plan, so after you move, the work happens in GanttFather only.

### Still have questions?

 Drop us a line — we usually reply in under a business day.

 support@ganttfather.com

## Try GanttFather free

 One project you own is free, with 2 editors and unlimited free viewers. Each extra project is US$5 a month.

 [Start free](https://app.ganttfather.com/login)
